My WebLink
|
Help
|
About
|
Sign Out
ORD 2280
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2201 - 2300
>
ORD 2280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2024 4:24:15 PM
Creation date
6/11/2024 4:24:01 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
6/4/2024
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No 2280 <br />structures shall be surveyed and verified as being in conformance to the <br />approved building heights as shown on Exhibit B or as otherwise conditioned <br />17 FINAL INSPECTION: Final inspection by the Planning Division is required prior <br />to occupancy. <br />18. FIREPLACES AND FIRE PITS: Fireplaces and fire pits shall be gas fireplaces, <br />pellet fueled wood heaters, or EPA certified wood -burning appliances. The <br />fireplace types shall be indicated on the plan and/or specification sheet(s) <br />submitted to for issuance of building permits. <br />Construction Practices and Noticing <br />19. WORK HOURS: All demolition and construction activities, inspections, plan <br />checking, material delivery, staff assignment or coordination, etc., shall be limited <br />to the hours of 8 a.m. to 5 p.m., Monday through Saturday. No construction shall <br />be allowed on State or Federal Holidays or Sundays. The Director of Community <br />Development may allow earlier "start times" or later "stop times" for specific <br />construction activities, e.g., concrete pouring. All construction equipment shall <br />meet Department of Motor Vehicles (DMV) noise standards and shall be <br />equipped with muffling devices. Prior to construction, the hours of construction <br />shall be posted on site. <br />20 CULTURAL RESOURCES: If any prehistoric or historic artifacts, or other <br />indication of cultural resources are found once the project construction is <br />underway, all work shall stop within 20 -meters (66 feet) of the find. A qualified <br />archaeologist shall be consulted for an immediate evaluation of the find prior to <br />resuming groundbreaking construction activities within 20 meters of the find. If <br />the find is determined to be an important archaeological resource, the resource <br />shall be either avoided, if feasible, or recovered consistent with the requirements <br />of the State California Environmental Quality Act (CEQA) Guidelines. In the event <br />that human remains are discovered during grading and construction of the <br />project, work shall stop immediately. There shall be no disposition of such human <br />remains, other than in accordance with the procedures and requirements set <br />forth in California Health and Safety Code Section 7050.5, Public Resources <br />Section 5097.98, and Title 14 California Code of Regulations Section 15064.5. <br />These code provisions require notification of the County Coroner, who may then <br />notify the Native American Heritage Commission, who in turn must notify the <br />persons believed to be most likely descended from the deceased Native <br />American for appropriate disposition of the remains. A similar note shall appear <br />on the building permit and/or improvement plans. <br />Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.