My WebLink
|
Help
|
About
|
Sign Out
O'GRADY PAVING, INC.
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
O
>
O'GRADY PAVING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2024 3:33:23 PM
Creation date
6/3/2024 4:27:34 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Maintenance Services
Contract Type
New
NAME
O'GRADY PAVING, INC.
Contract Record Series
704-05
Munis Contract #
2024556
Contract Expiration
6/30/2024
NOTES
ANNUAL STREET RESURFACING & PREVENTATIVE MAINTENANCE CIP. NO 24503
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACT <br />ANNUAL STREET RESURFACING & PREVENTATIVE MAINTENANCE <br />PROJECT NO. 24503 <br />THIS CONTRACT is made and entered into this 16th day of April 2024 by and <br />between O'Grady Paving , Inc., ("Contractor"), whose address is 2513 Wyandotte Street, <br />Mountain View, CA 94043 , and telephone number is (650) 966-1926 and the CITY OF <br />PLEASANTON, a municipal corporation ("City"). <br />W I T N E S S E T H: <br />WHEREAS, the City has awarded to the Contractor a contract for ANNUAL <br />STREET RESURFACING & PREVENTATIVE MAINTENANCE, <br />PROJECT NO. 24503 <br />NOW, THEREFORE , in consideration of the mutual promises set forth herein, <br />the parties agree as follows: <br />1. Work to be Performed. The work will generally consist of: <br />There are two components to this project: the first component is preventative <br />maintenance work in preparation for the City's Annual Slurry Seal Project; the second <br />component is the Annual Street Resurfacing Project work. <br />The preventive maintenance work includes approximately 50 ,000 square feet of full- <br />depth HMA repair (dig-out) and 8,000 pounds of crack sealing on various streets in <br />preparation for approximately 800 ,000 square feet of slurry-seal work that the City will <br />perform under a separate contract. Preventative maintenance work shall be completed no <br />later than August 16 , 2024. <br />The Annual Street Resurfacing Project work involves the resurfacing of approximately <br />1,640 ,000 square feet of existing pavement (approximately 20 ,000 tons HMA) and <br />approximately 105 ,000 square feet of full-depth HMA pavement repair on various streets <br />with HMA overlay , HMA overlay with paving mat, HMA overlay over cold-planed <br />pavement, or HMA overlay over the cold-in-place recycle pavement. <br />The project also includes the installation of asphalt leveling course in various locations, <br />wedge grinding or milling , adjusting manholes and valve boxes , etc. to grade , traffic <br />striping and pavement legends , pavement markers , traffic signal loops , traffic control and <br />any necessary coordination with other projects occurring within the vicinity of the project <br />site. <br />The contractor shall furnish all labor, materials , equipment, incidentals , transportation <br />and other necessary services to complete the work in accordance with these Project Plans <br />and Special Provisions. <br />DocuSign Envelope ID: 481D2ACD-7F64-46CA-9ACB-AF08839CFE54
The URL can be used to link to this page
Your browser does not support the video tag.