Laserfiche WebLink
PUD-149 Planning Commission <br />Page 3 of 6 <br />11. WINDOWS: Manufacturer type, design, material, and installation details for all windows <br />within the project shall be specified for each unit/building in conformance with the <br />Approved Plans in the building permit submittal. Any proposed modifications shall be <br />subject to review and approval by the Planning Division prior to issuance of building <br />permits. <br /> <br />12. FENCE/WALL: All fencing and walls shall be shown on the construction plans with the <br />building permit submittal. The design and location must be approved by the Planning <br />Division and comply with all setback requirements. <br /> <br />13. LIGHTING PLAN: The applicant shall submit a lighting plan with the building permit <br />submittal. The plan shall include photometric contours, manufacturer’s specifications on <br />the fixtures, and mounting heights. All exterior lighting including landscape lighting shall <br />be directed downward and designed or shielded so as to not shine onto neighboring <br />properties or streets. The photometrics shall be reviewed and approved by the City <br />Traffic Engineer and Director of Community Development prior to building permit <br />issuance. The type and location of all exterior light fixtures shall be reviewed and <br />approved by the Director of Community Development prior to building permit issuance. <br /> <br />14. BUILDING SURVEY: The applicant shall submit a building survey and/or record of survey <br />and a site development plan in accordance with the provisions of Chapter 18.68 of the <br />PMC. These plans shall be approved by the Chief Building Official prior to building permit <br />issuance. The site development plan shall include all required information to design and <br />construct site, grading, paving, drainage, and utilities. <br /> <br />15. PAD AND SETBACK CERTIFICATION: The applicant shall submit a pad elevation <br />certification prepared by a California licensed land surveyor or registered civil engineer to <br />the Chief Building Official and Director of Community Development certifying the pad <br />elevations and building locations (setbacks) are conforming to the approved plans, prior <br />to receiving a foundation inspection for the structures. <br /> <br />16. BUILDING HEIGHT CERTIFICATION: The applicant shall submit a building height <br />certification prepared by a California licensed land surveyor or civil engineer to the <br />Director of Community Development before the first framing or structural inspection by <br />the Building and Safety Division. The height of the structures shall be surveyed and <br />verified as being in conformance to the approved building heights as shown on Exhibit B <br />or as otherwise conditioned. <br /> <br />17. FINAL INSPECTION: Final inspection by the Planning Division is required prior to <br />occupancy. <br /> <br />18. FIREPLACES AND FIRE PITS: Fireplaces and fire pits shall be gas fireplaces, pellet <br />fueled wood heaters, or EPA certified wood-burning appliances. The fireplace types shall <br />be indicated on the plan and/or specification sheet(s) submitted to for issuance of <br />building permits.