My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2024
>
02-28
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 3:21:13 PM
Creation date
5/20/2024 3:15:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/28/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORANGE COUNTY . LOS ANGELES . BAY AREA . SACRAMENTO <br />A103200 HOPYARD ROAD <br />PLEASANTON, CALIFORNIA <br />0 4 8 16 <br />© 2023 WILLIAM HEZMALHALCH ARCHITECTS, INC. DBA WHA. | 2022302 | 07-14-23 <br />6-PLEX ELEVATIONS <br />Note: Artist’s Conception; Colors, Materials and Application May Vary. <br />1 2 3475 <br />8 69 <br />±2 <br />9 <br />' <br />- <br />8 <br />" <br /> <br />( <br />R <br />O <br />O <br />F <br /> <br />E <br />A <br />V <br />E <br />) <br /> <br />±2 <br />9 <br />' <br />- <br />8 <br />" <br /> <br />( <br />R <br />O <br />O <br />F <br /> <br />E <br />A <br />V <br />E <br />) <br /> <br />±3 <br />4 <br />' <br />- <br />0 <br />" <br /> <br />( <br />S <br />E <br />E <br /> <br />N <br />O <br />T <br />E <br />) <br /> <br />±3 <br />4 <br />' <br />- <br />0 <br />" <br /> <br />( <br />S <br />E <br />E <br /> <br />N <br />O <br />T <br />E <br />) <br /> <br />Rear Elevation <br />Perspective Rendering Rear Elevation <br />Left Elevation <br />Perspective Rendering Left Elevation <br />Roof: Concrete Flat Tile Roof <br />Fascia: Wood Fascia With Rafter Tails at Select Locations <br />Gable: Prefabricated Pipes <br />Exterior: Stucco <br />Windows: Insulated Vinyl Windows <br />Entry Door: Fiberglass Entry Door <br />Railing: Metal Railing <br />Garage Door: Metal Roll-Up Garage Door <br />Light Fixture: Outdoor Wall Sconce, see Sheet A22 <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />EXTERIOR MATERIALSKEY MAP <br />T.O.P. <br />F.F./T.O.C. <br />T.O.P.T.O.P. <br />F.F. <br />8' <br />- <br />1 <br />" <br />9' <br />- <br />1 <br />" <br />8' <br />- <br />1 <br />" <br />9' <br />- <br />1 <br />" <br />F.F. <br />T.O.P. <br />F.F./T.O.C. <br />T.O.P.T.O.P. <br />F.F. <br />9' <br />- <br />1 <br />" <br />9' <br />- <br />1 <br />" <br />F.F. <br />±3 <br />4 <br />' <br />- <br />0 <br />" <br /> <br />( <br />S <br />E <br />E <br /> <br />N <br />O <br />T <br />E <br />) <br />±2 <br />9 <br />' <br />- <br />8 <br />" <br /> <br />( <br />R <br />O <br />O <br />F <br /> <br />E <br />A <br />V <br />E <br />) <br />±3 <br />4 <br />' <br />- <br />0 <br />" <br /> <br />( <br />S <br />E <br />E <br /> <br />N <br />O <br />T <br />E <br />) <br />T.O.P. <br />F.F./T.O.C. <br />T.O.P.T.O.P. <br />F.F. <br />8' <br />- <br />1 <br />" <br />9' <br />- <br />1 <br />" <br />8' <br />- <br />1 <br />" <br />9' <br />- <br />1 <br />" <br />F.F. <br />T.O.P. <br />F.F./T.O.C. <br />T.O.P.T.O.P. <br />F.F. <br />9' <br />- <br />1 <br />" <br />9' <br />- <br />1 <br />" <br />F.F. <br />±2 <br />9 <br />' <br />- <br />8 <br />" <br /> <br />( <br />R <br />O <br />O <br />F <br /> <br />E <br />A <br />V <br />E <br />) <br />T.O.P. <br />F.F./T.O.C. <br />T.O.P.T.O.P. <br />F.F. <br />8' <br />- <br />1 <br />" <br />9' <br />- <br />1 <br />" <br />8' <br />- <br />1 <br />" <br />9' <br />- <br />1 <br />" <br />F.F. <br />T.O.P. <br />F.F./T.O.C. <br />T.O.P.T.O.P. <br />F.F. <br />9' <br />- <br />1 <br />" <br />9' <br />- <br />1 <br />" <br />F.F. <br />T.O.P. <br />F.F./T.O.C. <br />T.O.P.T.O.P. <br />F.F. <br />8' <br />- <br />1 <br />" <br />9' <br />- <br />1 <br />" <br />8' <br />- <br />1 <br />" <br />9' <br />- <br />1 <br />" <br />F.F. <br />T.O.P. <br />F.F./T.O.C. <br />T.O.P.T.O.P. <br />F.F. <br />9' <br />- <br />1 <br />" <br />9' <br />- <br />1 <br />" <br />F.F. <br />CATALYST <br />DEVELOPMENT | 2022302 | 01-30-23C 2022 WILLIAM HEZMALHALCH ARCHITECTS, INC. dba WHA. <br />3200 HOPYARD <br />PLEASANTON, CA <br />0 2 4 8 <br />A1.3 <br />Front Elevation <br />6-PLEX ELEVATIONS <br />NOTE: <br />Height of a structure shall be measured vertically from the average elevation of the <br />natural grade or finished grade, whichever is lower, of the ground covered by the <br />structure to the mean height between eaves and ridges for a hip, gable, or gambrel roof. <br />(Pleasanton Municipal Code, Zoning 18.84.140) <br />Right Elevation <br />Rear Elevation Left Elevation
The URL can be used to link to this page
Your browser does not support the video tag.