Laserfiche WebLink
<br />Page 5 <br /> <br />devices. Prior to construction, the hours of construction shall be posted on site. <br /> <br />21. CONSTRUCTION PARKING: Campers, trailers, motor homes, or any other similar vehicle are <br />not allowed on the construction site except when needed as sleeping quarters for a security <br />guard subject to receipt of a temporary conditional use permit (per PMC 18.116.010.E). <br /> <br />22. CONSTRUCTION TRAILERS: A construction trailer shall be allowed to be placed on the project <br />site for daily administration/coordination purposes during the construction period. <br /> <br />23. CONSTRUCTION AND PARKING MANAGEMENT PLAN: The applicant shall prepare a <br />construction and parking management plan to address impacts and parking demands during the <br />construction phase of the project. The construction and parking management plan shall be <br />subject to review and approval by the City Traffic Engineer and Director of Community <br />Development prior to issuance of a demolition permit, or the first building permit, whichever <br />comes first. The following items shall be incorporated into the construction and parking <br />management plan: <br /> <br />a. Show truck route for construction and delivery trucks that does not include neighborhood <br />residential streets, unless approved by the City Traffic Engineer; <br />b. Show construction vehicles and equipment parking area, materials storage, temporary <br />fencing, construction trailer location, and construction contractors/workers parking area. <br />c. Sidewalk closure or narrowing is not allowed during on-site construction activities without <br />prior approval by the City. <br /> <br />24. PORTABLE TOILETS: Portable toilets used during construction shall be kept on the project site <br />and as far as possible from existing residences and shall be emptied to prevent odor. <br /> <br />25. EXCESS SOIL AND SOIL STOCKPILING: All excess soil from the site shall be off-hauled from <br />the site and disposed of in a lawful manner. No temporary stockpiling of dirt on this site shall <br />occur unless approved with the grading plans or without specific review and approval by the <br />Director of Community Development. <br /> <br />26. NOTICE OF CONSTRUCTION: Prior to construction, the applicant shall notify neighbors within <br />300-feet of the project site of the construction schedule in writing. Such notice shall include <br />contact names and numbers for property owner, agent or contractor. <br /> <br />27. DISTURBANCE COORDINATOR: The applicant shall designate a “disturbance coordinator” <br />who shall be responsible for responding to any complaints regarding construction noise, dust, <br />construction parking, etc. The coordinator (who may be an employee of the general contractor) <br />shall determine the cause of the complaint and shall require the implementation of reasonable <br />measures warranted to correct the problem. A telephone number of the disturbance coordinator <br />shall be posted on the construction site fence and on the notification sent to neighbors adjacent <br />to the site. The sign shall also list an emergency after-hours contact number for the disturbance <br />coordinator, or designee. <br /> <br />28. CULTURAL RESOURCES: In the event that human remains are discovered during grading and <br />construction of the project, work shall stop immediately. There shall be no disposition of such <br />human remains, other than in accordance with the procedures and requirements set forth in <br />California Health and Safety Code Section 7050.5 and Public Resources Section 5097.98.