Laserfiche WebLink
<br /> <br /> <br /> <br />6671 Brisa Street ■ Livermore, California 94550 ■ Tel (925) 371-5900 <br />Proposal No. EB-24-0282-P-MT <br />February 16, 2024 <br />Revised April 1, 2024 <br /> <br />City of Pleasanton – Public Works Department, Engineering Division <br />200 Old Bernal Avenue <br />Pleasanton, CA 94566 <br /> <br />Attention: Mr. SM Saklaen, PE <br /> <br />Subject: HOPYARD ROAD AND OWENS DRIVE INTERSECTION IMPROVEMENTS <br /> CIP NO. 15525 <br /> PLEASANTON, CALIFORNIA <br /> PROPOSAL FOR MATERIALS TESTING AND SPECIAL INSPECTION <br /> <br />References: 1. Plans: City of Pleasanton, Public Works Department, Hopyard Rd and Owens Dr Intersection <br />Improvement, CIP # 15525, Pleasanton, California, dated August, 2023. <br /> 2. Specifications: City of Pleasanton, Public Works Department, Engineering Division, General <br />Provisions, Notice to Bidders, Special Provisions, Proposal and Contract for Hopyard Road <br />and Owens Drive Intersection Improvements, Project No. 15525. <br /> 3. City of Pleasanton, Addendum No. 1, Hopyard Road and Owens Drive Intersection <br />Improvements, Project No. 15525, dated March 4, 2024. <br /> 4. City of Pleasanton, Addendum No. 2, Hopyard Road and Owens Drive Intersection <br />Improvements, Project No. 15525, dated March 14, 2024. <br />Dear Mr. Saklaen: <br />In accordance with your request, we are pleased to provide this scope of work summary and fee estimate for <br />the subject project. Included herein are a project description, scope of services outline and resultant fee <br />estimate. We have assumed that prevailing wage requirements will apply to our field representatives on this <br />project and work will occur at night. This scope of work summary and fee estimate has been revised to reflect <br />changes to the project scope. <br />PROJECT DESCRIPTION AND SCOPE OF SERVICES <br />The project will consist of constructing a southbound right-turn lane along Hopyard Road at the Owens Drive <br />intersection, modifying the lane configurations on Hopyard Road south of Owens Drive, adding a southbound <br />bike lane from the I-580 eastbound off-ramp intersection to south of Owens Drive, constructing a soundwall <br />along the west side of Hopyard Road north of Owens Drive, rehabilitating existing pavements, and various <br />improvements to sidewalks, curb and gutter, traffic signals, and storm drain facilities. A portion of the project <br />will be constructed within the Caltrans Right-of-Way, and we understand that materials testing and inspections <br />are to be in general conformance with Caltrans’ requirements. <br /> <br />We anticipate our technicians will be onsite for materials inspection and/or special inspection related to the <br />following activities: <br />• Drilling of shafts for cast-in-drilled-hole piers for the soundwall. <br />• Concrete placement for traffic signal foundations, soundwall piers, soundwall pile cap, soundwall <br />barrier, and high-early-strength driveway pavement. <br />• Masonry construction for the soundwall. <br />• Backfill operations for storm drain improvements and sound wall structural backfill. <br />Exhibit A <br />DocuSign Envelope ID: E98D18FD-044F-4EAC-A836-347C5592F316