My WebLink
|
Help
|
About
|
Sign Out
GEOCON CONSULTANTS, INC. (V2061)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
G
>
GEOCON CONSULTANTS, INC. (V2061)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2024 2:20:48 PM
Creation date
5/16/2024 2:20:21 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
New
NAME
GEOCON CONSULTANTS, INC. (V2061)
Contract Record Series
704-05
Munis Contract #
2024554
Contract Expiration
12/31/2025
NOTES
GEOTECHNICAL ENGINEERING AND MATERIAL TESTING SERVICES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br />recommends approving a fourth amendment to the professional services agreement with <br />Consor North America, Inc. for the not-to-exceed amount of $119,855 (for a total not-to-exceed <br />agreement amount of $378,213). <br /> <br />Material Testing Services <br />Under an existing on-call agreement with the City, Geocon Consultants, Inc. performed soils <br />boring and provided a geotechnical design report for the soundwall in the amount of $20,482. <br />Material testing services during construction will also be provided by Geocon. The testing <br />services are required to provide specialty testing of the materials in conformance with Caltrans’ <br />standards and the City’s Quality Assurance Program. Staff recommends awarding a <br />professional services agreement to Geocon Consultants, Inc. for the not-to-exceed amount of <br />$124,260 for material testing services. <br /> <br />Schedule <br />The proposed schedule for the project is: <br /> <br />Approval of Plans and Specifications and Award of Contract May 7, 2024 <br />Start of Construction June 2024 <br />End of Construction May 2025 <br /> <br /> <br />EQUITY AND SUSTAINABILITY <br />Approval of this action advances the Climate Action Plan (CAP 2.0) in Transportation and Land <br />Use by promoting an effective transportation system with walking and bicycling. <br /> <br />OUTREACH <br />Construction notices, social media posts, and information will be posted on the City’s website <br />prior to the start of construction. Construction message boards will be installed two weeks in <br />advance of work on major roadways. <br /> <br />STRATEGIC PLAN ALIGNMENT <br />Approval of this action advances the Citywide ONE Pleasanton strategic plan goal of Investing <br />in Our Environment, Strategy 1 – Implement the four-year Capital Improvement Program (CIP) <br />to complete design and construction of budgeted capital projects. <br /> <br />FISCAL IMPACT <br />The total Capital Improvement Program budget allocation for the Hopyard Road and Owens <br />Drive Intersection Improvements Project, CIP No. 15525, is $5,850,000. The anticipated total <br />expenditure for this project is $5,702,000, leaving a balance of $148,000. Expenditures include <br />design, construction award, contingency, support services, advertising, and other <br />miscellaneous costs. <br /> <br />Dougherty Valley Mitigation Reserve, CIP No. 02523, has a reserve balance of $377,694 and <br />collected fees from traffic impacts due to development within the City of Dublin. This project is <br />eligible to utilize the reserve, and staff recommends exchanging Streets General Fund (Fund <br />211) funding with the reserve, returning the unused project balance to the fund balance to be <br />programmed in the mid-term CIP update. The funding and anticipated project expenditures are <br />detailed in Attachment 2. <br />DocuSign Envelope ID: E98D18FD-044F-4EAC-A836-347C5592F316
The URL can be used to link to this page
Your browser does not support the video tag.