Laserfiche WebLink
Proposal No. EB-24-0282-P-MT - 2 - February 16, 2024 <br />Revised April 1, 2024 <br />• Compaction of subgrade, aggregate subbase, and aggregate base, for new pavements, sidewalks, <br />curb and gutter, bike path, and island paving. <br />• Placement of hot-mix asphalt for new and rehabilitated pavements. <br />Based on the information presented above, our anticipated services and estimated fee are outlined below. Our <br />services will be provided on an on-call, time-and-materials basis as requested by City representatives. Our total <br />effort will be largely contingent upon the construction schedule, pace of construction and contractor <br />performance. Our materials testing services will be invoiced per our attached 2023 Schedule of Fees. <br />Task Estimated Fee <br />Part I: Materials Testing and Special Inspection <br /> Field Technician – Cast-in-drilled-hole pier drilling observation, concrete sampling and <br /> testing. (estimated 6 trips and 52 technician hours) $10,950 <br /> Abe Construction Services, Inc. – Gamma Gamma Logging for cast-in-drilled-hole piers for <br /> soundwall. $3,800 <br /> Field Technician – Concrete sampling and testing for traffic signal foundations, soundwall <br /> pile cap, soundwall barrier, and high-early-strength driveway pavement. <br /> (estimated 8 trips and 40 technician hours) <br />$8,020 <br /> Field Technician – Masonry inspection and mortar sampling. <br /> (estimated 2 trips and 16 technician hours) $3,395 <br /> Field Technician – Compaction testing of storm drain and soundwall backfill. <br /> (estimated 4 trips and 32 technician hours) $6,795 <br /> Field Technician – Compaction testing of subgrade, aggregate subbase, and aggregate base. <br /> (estimated 16 trips and 128 technician hours) $27,180 <br /> Field Technician – Compaction testing and sampling of hot-mix asphalt. <br /> (estimated 10 trips and 98 technician hours) $20,850 <br /> Outside Services – Asphalt coring. $2,820 <br /> Laboratory Testing <br /> Sieve Analysis, CTM 202 (21 total) <br /> Sand Equivalent, CTM 217 (17 total) <br /> Durability Index, CTM 229 (2 total) <br /> R-value, CTM 301 (3 total) <br /> California Impact, CTM 216 (8 total) <br /> LA Abrasion, CTM 211 (8 total) <br /> Aggregate Cleanness, CTM 227 (7 total) <br /> Flat and Elongated Particles, CTM 235 (1 total) <br /> Fine Aggregate Angularity, CTM 234 (1 total) <br /> Percent Crushed Particles, CTM 205 (1 total) <br /> HMA Theoretical Max. Specific Gravity, CTM 309 (10 total) <br /> % Asphalt Binder, CTM 382 (10 total) <br /> HMA Sieve Analysis with ignition, CTM 202 (2 total) <br /> HMA Air Voids, AASHTO T269 (1 total) <br /> Hamburg Wheel Tracker, CTM 389 (1 total) <br /> HMA Core Unit Weight, CTM 308 (8 total) <br /> Concrete Compressive Strength, ASTM C39 (9 sets of 5 cylinders) <br /> Mortar Compressive Strength, ASTM C109 (2 sets of 3 cylinders) <br /> Lab Subtotal: <br /> <br />$2,625 <br />1,700 <br />330 <br />900 <br />2,000 <br />1,800 <br />2,255 <br />150 <br />125 <br />150 <br />1,800 <br />1,250 <br />500 <br />525 <br />1,000 <br />800 <br />1,350 <br />180 <br />$19,440 <br /> Subtotal – Part I: $99,450 <br />Part II: Engineering Support, Project Management and Reporting $15,090 <br />Part III: Contingency Budget <br /> (5% of the sum of Parts I and II, only to be used with City’s approval) $5,920 <br />TOTAL ESTIMATED FEE: $124,260 <br />DocuSign Envelope ID: 14369EE6-B805-41B3-A371-34FFE0CB57FDDocuSign Envelope ID: E98D18FD-044F-4EAC-A836-347C5592F316