Laserfiche WebLink
Project:E. Vineyard Detention Pond Outfall Pipe <br />Job No.: 29225.000 <br />Description: Summary <br />Principal <br />Engineering <br />Manager <br />(Chris <br />Guenther) <br />Senior <br />Engineer / <br />Surveyor <br />(Travis <br />Pashon-Silva) <br />Associate <br />Engineer / <br />Surveyor <br />Assistant <br />Engineer / <br />Surveyor <br />Junior <br />Engineer <br />Principal <br />Technician <br />Senior <br />Technician <br />Field Crew <br />Supervisor <br />1-Man Survey <br />Crew <br />2-Man Survey <br />Crew M&S Subtotal <br />1.1 Project Management/Meetings/Coordination 0.0 4.0 8.0 0.0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 3,824.00$ <br />3,824.00$ <br />2.1 Records Research and Investigation 0.0 0.0 2.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 852.00$ <br />2.2 Site Visit / Damage Assessment 0.0 2.0 2.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 1,420.00$ <br />2.3 Topographical Survey / Base Mapping 0.0 0.0 1.0 0.0 0.0 0.0 0.0 3.0 2.0 0.0 8.0 3,732.00$ <br />6,004.00$ <br />3.1 Sample Plans / Details (35% Plans)0.0 4.0 8.0 0.0 16.0 16.0 0.0 0.0 0.0 0.0 0.0 8,448.00$ <br />3.2 65% Plans and Specifications 0.0 4.0 8.0 0.0 12.0 12.0 0.0 0.0 0.0 0.0 0.0 7,112.00$ <br />3.3 95% Plans, Specifications and Estimates 0.0 2.0 4.0 0.0 8.0 8.0 0.0 0.0 0.0 0.0 0.0 4,224.00$ <br />3.4 100% IFC Construction Documents 0.0 2.0 4.0 0.0 4.0 4.0 0.0 0.0 0.0 0.0 0.0 2,888.00$ <br />22,672.00$ <br />4.1 Bid Support 0.0 2.0 4.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 1,912.00$ <br />1,912.00$ <br />Total Hours 0 20 41 0 50 40 0 3 2 0 8 <br />Hourly Rate $314 $284 $246 $216 $180 $154 $188 $158 $194 $200 $328 <br />Amount -$ 5,680$ 10,086$ -$ 9,000$ 6,160$ -$ 474$ 388$ -$ 2,624$ <br />34,412.00$ <br />Fee Estimate <br />Task Description <br />MacKay & Somps Labor Classification <br />M&S Fee Summary - E Vineyard Detention Pond Outfall Pipe.xls\Fee Summary - M&S Page 2 of 4 Printed 3/5/2024 <br />DocuSign Envelope ID: 9D598DAC-5F24-41FA-B827-97D013A47ECADocuSign Envelope ID: CEB20404-63F8-4DC5-AE6A-C5FC89DB6F87