Laserfiche WebLink
Pr <br />i <br />n <br />c <br />i <br />p <br />a <br />l <br />As <br />s <br />o <br />c <br />i <br />a <br />t <br />e <br />Se <br />n <br />i <br />o <br />r <br /> <br />En <br />g <br />i <br />n <br />e <br />e <br />r <br />Pr <br />o <br />j <br />e <br />c <br />t <br /> <br />En <br />g <br />i <br />n <br />e <br />e <br />r <br />Cu <br />l <br />t <br />u <br />r <br />a <br />l <br /> <br />Re <br />s <br />o <br />u <br />r <br />c <br />e <br />s <br /> <br />(E <br />D <br />S <br />) <br />* <br />CA <br />D <br />/ <br />G <br />I <br />S <br /> <br />Sp <br />e <br />c <br />i <br />a <br />l <br />i <br />s <br />t <br /> <br />(i <br />n <br />c <br />l <br />u <br />d <br />e <br />s <br /> <br />Au <br />t <br />o <br />C <br />A <br />D <br /> <br />U <br />n <br />i <br />t <br /> <br />Pr <br />o <br />j <br />e <br />c <br />t <br /> <br />As <br />s <br />i <br />s <br />t <br />a <br />n <br />t <br />$365.00 $305.00 $295.00 $235.00 $203.00 $195.00 $145.00 <br />Cultural Resources Evaluation (EDS)20 0 20 4,060.00$ <br />Topographic Survey and Biological Assessment Coord.3 3 915.00$ <br />4,975.00$ 4,975.00$ <br />Engineer/Geologist Fieldwork 1 3 4 1,010.00$ <br />Hydraulic Analysis (Existing Stream Channel)3 10 13 3,265.00$ <br />Report for Resource Agency Approval 1 8 3 3 4 1 20 5,320.00$ <br />9,595.00$ 9,595.00$ <br />Alternatives Analysis 4 4 2,160.00$ <br />Meeting with City 4 1,220.00$ <br />60% Plan Development 10 4 5 2 21 5,255.00$ <br />8,635.00$ 8,635.00$ <br />Cooridantion with WRA 1 2 2 5 1,445.00$ <br />Response to Comments 1 4 5 10 2,760.00$ <br />Final Basis of Design Report 3 3 8 6 2 22 5,350.00$ <br />8,110.00$ 8,110.00$ <br />100% Plan, Specifications and Engineers Estimate 2 2 1 2 7 1,565.00$ <br />1,565.00$ 1,565.00$ <br />Final Engineer's Report 1 10 5 16 4,590.00$ <br />4,590.00$ 4,590.00$ <br />141 <br />*Includes 15 markup Total 37,470.00$ 37,470.00$ <br />Cultural Resources Evaluation (EDS)20 0 20 4,060.00$ <br />Topographic Survey and Biological Assessment Coord.3 3 915.00$ <br />4,975.00$ 4,975.00$ <br />Engineer/Geologist Fieldwork 1 3 4 1,010.00$ <br />Hydraulic Analysis (Trib Channel)3 15 18 4,440.00$ <br />Preliminary Basis of Design Report 1 10 5 5 4 1 26 6,990.00$ <br />12,440.00$ 12,440.00$ <br />Alternatives Analysis 1 1 2 540.00$ <br />Meeting with City 2 2 610.00$ <br />Combine with Basis of Design Report 2 2 1 5 1,145.00$ <br />2,295.00$ 2,295.00$ <br />Cooridantion with WRA 1 2 6 9 2,385.00$ <br />Response to Comments 1 10 4 15 4,355.00$ <br />Final Basis of Design Report 2 5 5 4 6 2 24 6,130.00$ <br />10,485.00$ 10,485.00$ <br />100% Plan, Specifications and Engineers Estimate 2 5 7 2,085.00$ <br />2,085.00$ 2,085.00$ <br />Final Engineer's Report 1 7 6 5 1 20 5,030.00$ <br />5,030.00$ 5,030.00$ <br />155 <br />*Includes 15% markup Total 37,310.00$ 37,310.00$ <br />Cultural Resources Evaluation (EDS)20 0 20 4,060.00$ <br />Topographic Survey and Biological Assessment Coord.3 3 915.00$ <br />4,975.00$ 4,975.00$ <br />Engineer/Geologist Fieldwork 1 3 4 1,010.00$ <br />Hydraulic Analysis (Existing Stream Channel)3 20 23 5,615.00$ <br />Report for Resource Agency Approval 1 15 3 5 4 2 30 8,070.00$ <br />14,695.00$ 14,695.00$ <br />Alternatives Analysis 4 4 2,160.00$ <br />Meeting with City 4 1,220.00$ <br />60% Plan Development 10 20 25 2 57 12,915.00$ <br />16,295.00$ 16,295.00$ <br />ENGEO PROPOSED FEES <br />City of Pleasanton <br />Engineering Design Services for Various City Sites Damaged in the 2023 Storm Event <br />Task 1 - Preliminary Studies <br />Task 2 – Basis of Design Report <br />Task 3 – 60% Plans for Resource Agency Submittal <br />Professional Services Rates <br /> P <br />r <br />o <br />p <br />o <br />s <br />a <br />l <br /> <br />B <br />u <br />d <br />g <br />e <br />t <br /> <br /> U <br />n <br />i <br />t <br /> <br />S <br />u <br />b <br />t <br />o <br />t <br />a <br />l <br /> <br /> <br /> C <br />o <br />s <br />t <br /> <br />S <br />u <br />b <br />t <br />o <br />t <br />a <br />l <br /> <br /> C <br />o <br />s <br />t <br /> <br />T <br />o <br />t <br />a <br />l <br />s <br /> <br />Task 5 – 100% Plan Set (Coordination with M&S) <br />Task 3 – Review Plans from M&S <br />Task 6 – FEMA Engineer's Report <br />Task <br />Task 4 – Resource Agency Coordination <br />Task 1 - Preliminary Studies <br />Task 2 – Basis of Design Report <br />E. Vineyard Detention Pond Outfall Pipe <br />Task 1 - Preliminary Studies <br />Task 2 – Basis of Design Report <br />Task 3 – 30% Review Plans from M&S <br />Task 4 – Resource Agency Coordination <br />Task 5 – 100% Plan Set (Coordination with M&S) <br />Task 6 – FEMA Engineer's Report <br />Oak Tree Farm Outfall and Channel Stabilization <br />Augustin Bernal Trail Creek Crossing Culverts <br />DocuSign Envelope ID: 9D598DAC-5F24-41FA-B827-97D013A47ECADocuSign Envelope ID: CEB20404-63F8-4DC5-AE6A-C5FC89DB6F87