Pr
<br />i
<br />n
<br />c
<br />i
<br />p
<br />a
<br />l
<br />As
<br />s
<br />o
<br />c
<br />i
<br />a
<br />t
<br />e
<br />Se
<br />n
<br />i
<br />o
<br />r
<br />
<br />En
<br />g
<br />i
<br />n
<br />e
<br />e
<br />r
<br />Pr
<br />o
<br />j
<br />e
<br />c
<br />t
<br />
<br />En
<br />g
<br />i
<br />n
<br />e
<br />e
<br />r
<br />Cu
<br />l
<br />t
<br />u
<br />r
<br />a
<br />l
<br />
<br />Re
<br />s
<br />o
<br />u
<br />r
<br />c
<br />e
<br />s
<br />
<br />(E
<br />D
<br />S
<br />)
<br />*
<br />CA
<br />D
<br />/
<br />G
<br />I
<br />S
<br />
<br />Sp
<br />e
<br />c
<br />i
<br />a
<br />l
<br />i
<br />s
<br />t
<br />
<br />(i
<br />n
<br />c
<br />l
<br />u
<br />d
<br />e
<br />s
<br />
<br />Au
<br />t
<br />o
<br />C
<br />A
<br />D
<br />
<br />U
<br />n
<br />i
<br />t
<br />
<br />Pr
<br />o
<br />j
<br />e
<br />c
<br />t
<br />
<br />As
<br />s
<br />i
<br />s
<br />t
<br />a
<br />n
<br />t
<br />$365.00 $305.00 $295.00 $235.00 $203.00 $195.00 $145.00
<br />Cultural Resources Evaluation (EDS)20 0 20 4,060.00$
<br />Topographic Survey and Biological Assessment Coord.3 3 915.00$
<br />4,975.00$ 4,975.00$
<br />Engineer/Geologist Fieldwork 1 3 4 1,010.00$
<br />Hydraulic Analysis (Existing Stream Channel)3 10 13 3,265.00$
<br />Report for Resource Agency Approval 1 8 3 3 4 1 20 5,320.00$
<br />9,595.00$ 9,595.00$
<br />Alternatives Analysis 4 4 2,160.00$
<br />Meeting with City 4 1,220.00$
<br />60% Plan Development 10 4 5 2 21 5,255.00$
<br />8,635.00$ 8,635.00$
<br />Cooridantion with WRA 1 2 2 5 1,445.00$
<br />Response to Comments 1 4 5 10 2,760.00$
<br />Final Basis of Design Report 3 3 8 6 2 22 5,350.00$
<br />8,110.00$ 8,110.00$
<br />100% Plan, Specifications and Engineers Estimate 2 2 1 2 7 1,565.00$
<br />1,565.00$ 1,565.00$
<br />Final Engineer's Report 1 10 5 16 4,590.00$
<br />4,590.00$ 4,590.00$
<br />141
<br />*Includes 15 markup Total 37,470.00$ 37,470.00$
<br />Cultural Resources Evaluation (EDS)20 0 20 4,060.00$
<br />Topographic Survey and Biological Assessment Coord.3 3 915.00$
<br />4,975.00$ 4,975.00$
<br />Engineer/Geologist Fieldwork 1 3 4 1,010.00$
<br />Hydraulic Analysis (Trib Channel)3 15 18 4,440.00$
<br />Preliminary Basis of Design Report 1 10 5 5 4 1 26 6,990.00$
<br />12,440.00$ 12,440.00$
<br />Alternatives Analysis 1 1 2 540.00$
<br />Meeting with City 2 2 610.00$
<br />Combine with Basis of Design Report 2 2 1 5 1,145.00$
<br />2,295.00$ 2,295.00$
<br />Cooridantion with WRA 1 2 6 9 2,385.00$
<br />Response to Comments 1 10 4 15 4,355.00$
<br />Final Basis of Design Report 2 5 5 4 6 2 24 6,130.00$
<br />10,485.00$ 10,485.00$
<br />100% Plan, Specifications and Engineers Estimate 2 5 7 2,085.00$
<br />2,085.00$ 2,085.00$
<br />Final Engineer's Report 1 7 6 5 1 20 5,030.00$
<br />5,030.00$ 5,030.00$
<br />155
<br />*Includes 15% markup Total 37,310.00$ 37,310.00$
<br />Cultural Resources Evaluation (EDS)20 0 20 4,060.00$
<br />Topographic Survey and Biological Assessment Coord.3 3 915.00$
<br />4,975.00$ 4,975.00$
<br />Engineer/Geologist Fieldwork 1 3 4 1,010.00$
<br />Hydraulic Analysis (Existing Stream Channel)3 20 23 5,615.00$
<br />Report for Resource Agency Approval 1 15 3 5 4 2 30 8,070.00$
<br />14,695.00$ 14,695.00$
<br />Alternatives Analysis 4 4 2,160.00$
<br />Meeting with City 4 1,220.00$
<br />60% Plan Development 10 20 25 2 57 12,915.00$
<br />16,295.00$ 16,295.00$
<br />ENGEO PROPOSED FEES
<br />City of Pleasanton
<br />Engineering Design Services for Various City Sites Damaged in the 2023 Storm Event
<br />Task 1 - Preliminary Studies
<br />Task 2 – Basis of Design Report
<br />Task 3 – 60% Plans for Resource Agency Submittal
<br />Professional Services Rates
<br /> P
<br />r
<br />o
<br />p
<br />o
<br />s
<br />a
<br />l
<br />
<br />B
<br />u
<br />d
<br />g
<br />e
<br />t
<br />
<br /> U
<br />n
<br />i
<br />t
<br />
<br />S
<br />u
<br />b
<br />t
<br />o
<br />t
<br />a
<br />l
<br />
<br />
<br /> C
<br />o
<br />s
<br />t
<br />
<br />S
<br />u
<br />b
<br />t
<br />o
<br />t
<br />a
<br />l
<br />
<br /> C
<br />o
<br />s
<br />t
<br />
<br />T
<br />o
<br />t
<br />a
<br />l
<br />s
<br />
<br />Task 5 – 100% Plan Set (Coordination with M&S)
<br />Task 3 – Review Plans from M&S
<br />Task 6 – FEMA Engineer's Report
<br />Task
<br />Task 4 – Resource Agency Coordination
<br />Task 1 - Preliminary Studies
<br />Task 2 – Basis of Design Report
<br />E. Vineyard Detention Pond Outfall Pipe
<br />Task 1 - Preliminary Studies
<br />Task 2 – Basis of Design Report
<br />Task 3 – 30% Review Plans from M&S
<br />Task 4 – Resource Agency Coordination
<br />Task 5 – 100% Plan Set (Coordination with M&S)
<br />Task 6 – FEMA Engineer's Report
<br />Oak Tree Farm Outfall and Channel Stabilization
<br />Augustin Bernal Trail Creek Crossing Culverts
<br />DocuSign Envelope ID: 9D598DAC-5F24-41FA-B827-97D013A47ECADocuSign Envelope ID: CEB20404-63F8-4DC5-AE6A-C5FC89DB6F87
|