My WebLink
|
Help
|
About
|
Sign Out
JMB CONSTRUCTION, INC.
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
J
>
JMB CONSTRUCTION, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2024 2:33:17 PM
Creation date
4/30/2024 10:15:24 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Maintenance Services
Contract Type
New
NAME
JMB CONSTRUCTION, INC.
Contract Record Series
704-05
Contract Expiration
6/30/2024
NOTES
NEAR-TERM WATER IMPROVEMENT PROJECT NO. 24171 & 24173
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item Quantity Unit of Item Description Unit Price Total No. (Approximate) Measure <br />10 LF 24" FPVC Vertical Depth ;fo /; )(It} 85 Adjustments (6FT to 8FT) <br />100 LF 18" DIP Vertical Depth Adjustments z$ 2,ftJGJ 86 (OFT to 2FT) <br />so LF 18" DIP Vertical Depth Adjustments 4-} 1, 25£' 87 (2FT to 4FT) <br />10 LF 18" DIP Vertical Depth Adjustments /~0 I, cJ t)(J 88 (4FTto 6FT) <br />10 LF 1811 DIP Vertical Depth Adjustments /)O /,) tJ:> 89 (6FTto 8FT) <br />90 75 LF 16" DIP Vertical Depth Adjustments 2 i-/, 6So (OFT to 2FT) <br />10 LF 16" DIP Vertical Depth Adjustments Lft-Lt 1.-tJ 91 (2FT to 4FT) <br />92 10 LF 16" DIP Vertical Depth Adjustments q () q1Jo (4FT to 6FT) <br />93 10 LF 16" DIP Vertical Depth Adjustments !Jf It '3 .f tJ (6FTto 8FT) <br />94 1 LS Electrical System 3s'b,ooo 3~0C'0 , - <br />PG&E Conduit from transformer to ffo f:J-,J;£J 95 250 LF PG&E Tie-In. two 3" conduit and <br />one pull box <br />Near Term Water Improvements CIP 24171 & 24173 <br />Addendum No. 2 Page 10 <br />DocuSign Envelope ID: 7FAA54C3-9A1A-4C50-9AAD-7467E7B73787
The URL can be used to link to this page
Your browser does not support the video tag.