My WebLink
|
Help
|
About
|
Sign Out
JMB CONSTRUCTION, INC.
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
J
>
JMB CONSTRUCTION, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2024 2:33:17 PM
Creation date
4/30/2024 10:15:24 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Maintenance Services
Contract Type
New
NAME
JMB CONSTRUCTION, INC.
Contract Record Series
704-05
Contract Expiration
6/30/2024
NOTES
NEAR-TERM WATER IMPROVEMENT PROJECT NO. 24171 & 24173
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACT <br />NEAR-TERM WATER IMPROVEMENTS <br />PROJECT NO. 24171 & 24173 <br />THIS CONTRACT is made and entered into this 19th day of March, 2024 , by and <br />between JMB Construction, Inc ., ("Contractor"), whose address is 132 South Maple <br />Avenue, South San Francisco , CA 94080 , and telephone number is (650) 267-5292 and <br />the CITY OF PLEASANTON, a municipal corporation ("City"). <br />W I T N E S S E T H: <br />WHEREAS , the City has awarded to the Contractor a contract for NEAR-TERM <br />WATER IMPROVEMENTS, PROJECT NO. 24171 & 24173 <br />NOW, THEREFORE, in consideration of the mutual promises set forth herein , <br />the parties agree as follows: <br />1. Work to be Performed. The work will generally consist of: <br />For Project No. 24171 Stoneridge (F-1) Line and Turnout No . 4: <br />The work shall consist of, but is not limited to , providing and installing 3,500 <br />linear feet of 24-inch fusible polyvinyl chloride potable water main by open <br />trench; 50 linear feet of24-inch, 120 linear feet of 18-inch, and 200 linear feet of <br />16-inch HDSS Class 350 ductile iron potable water main by open trench ; 40 <br />linear feet of fusible pipe in steel casing by jack and bore; connection to city's <br />existing 12-inch and 16-inch potable mains. All improvements are to be <br />restrained, externally kicked, and cathodically protected. Work also includes , but <br />is not limited to , site preparation for installation of prepacked booster station <br />(prepackaged station by others); construction of new turnout; remobilization to <br />install prepacked station including electrical tie-ins ; connection to new potable <br />main and Zone 7's existing 20-inch line ; coordination with booster station <br />supplier for testing and acceptance of system ; disinfection , flushing , testing and <br />acceptance of new water mains ; abandonment and removal of pipe; and street, <br />landscape , and hardscape restoration . <br />For Project No. 24173 Sunol Pipeline Improvements (F-7 Line): <br />The work shall consist of, but is not limited to , providing and installing 4 ,500 <br />linear feet of 20-inch HDSS Class 350 potable water main by open trench ; 30 <br />linear feet of 20-inch ductile iron pipe in steel casing by jack and bore; connection <br />to city 's existing 12-inch, 20-inch, and 24-inch potable mains. All improvements <br />are to be restrained , externally kicked, and bonded. Work also includes , but is not <br />limited to , disinfection , flushing , testing and acceptance of new water main; and <br />street, landscape , and hardscape restoration . <br />Page 18 <br />DocuSign Envelope ID: 7FAA54C3-9A1A-4C50-9AAD-7467E7B73787
The URL can be used to link to this page
Your browser does not support the video tag.