My WebLink
|
Help
|
About
|
Sign Out
WILSON GENERAL CONTRACTING, INC. 2024457
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
W
>
WILSON GENERAL CONTRACTING, INC. 2024457
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2024 3:51:52 PM
Creation date
3/6/2024 8:24:46 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Maintenance Services
Contract Type
New
NAME
WILSON GENERAL CONTRACTING
Contract Record Series
704-05
Munis Contract #
2024457
Contract Expiration
6/30/2024
NOTES
MAINTENANCE & TRADE AGREEMENT. OSC GENERATOR REPLACEMENT CIP NO. 23456
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wilson General Contracting Inc. <br />1852 W 11 St., Suite 149 <br />Tracy, CA 95376 <br />(925) 915 1606 <br />w_generalcontractor@yahoo.com <br />http://www.wilsongeneralcontracting.com <br />Proposal <br />ADDRESS <br />City of Pleasanton DATE <br />01/25/2024 <br />TOTAL <br />$88,816.00 <br />ACTIVITY QTY RATE AMOUNT <br />New Generator <br />Unloading and Securing: Provide 10 ton <br />crane on site City of Pleasanton yard <br />facilities. Provide safe environment for crane <br />and workers to operate by safing-off work <br />area to be determined by contractor on site <br />project manager. Unload new generator from <br />semi truck flat bed delivered by others. Install <br />new generator at the permanent location on <br />existing concrete pad. Anchor and secure <br />new generator per manufacturer <br />recommendation. <br />1 27,890.00 27,890.00 <br />Electrical <br />Preparation for shut off power: Prep for shut <br />off power of Yard facility. Coordinate with the <br />City of Pleasanton project manager. Provide <br />Qty 5 generator to power some of the <br />equipment in multiple location due to <br />sensitive equipment, phone lines and <br />emergency equipment have to have power at <br />all time no exception. General Contractor will <br />coordinate with the City Management. <br />1 8,950.00 8,950.00 <br />Electrical <br />Install new wiring 600mcm copper wire for <br />the new generator 250kw use existing <br />conduit underground all the way to the <br />existing switch gear cabinet approximately 15 <br />feet away. Connect all contact termination to <br />the new generator and existing switch gear <br />cabinet. Start up and run test for the new <br />generator will be done by others. <br />1 51,976.00 51,976.00 <br />EXHIBIT A <br />DocuSign Envelope ID: A181A6E1-38C6-4FC4-9DB3-55096154243F
The URL can be used to link to this page
Your browser does not support the video tag.