Laserfiche WebLink
Page 3 of 7 <br />2023, and the Vesting Tentative Map was approved by the Planning Commission on <br />November 8, 2023. No appeal of either action was filed, and the approvals are currently <br />effective. <br /> <br />DISCUSSION <br />The approved project includes seven, three-story buildings with 42 townhome-style <br />condominiums, totaling 69,302 square feet of residential space. The townhomes would <br />range in size from approximately 1,403 to 2,150 square feet, with either 3 or 4 bedrooms. <br />The approved project includes approximately 20,000 square feet of group open space. Each <br />townhome will have a two-car private garage accessed via common access streets and <br />three guest parking spaces are provided within the project’s interior streets. The project is <br />accessed off Lockhart Lane via Evergreen Court and Scarlet Court. The internal streets loop <br />around the site, with Willow Oak Court dead-ending to provide access to three units at the <br />end of Building F. A site plan is shown in Figure 2, and an elevation of the approved project <br />is shown in Figure 3. In issuing the Design Review approval, the Zoning Administrator found <br />the project to be in conformance with all the applicable standards as defined in the ODS and <br />elsewhere in City regulations. <br /> <br />Figure 2: Site Plan <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Page 41 of 228