My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
HOUSING
>
AGENDAS
>
2024
>
011824
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2024 2:46:50 PM
Creation date
1/11/2024 2:46:37 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/18/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page - 3 - <br /> <br />The project is subject to the Housing Element sites ODS, including the specific standards for Area <br />16 that include a larger setback from existing single-family residential properties than is typically <br />required for sites of similar density. <br /> <br />The Design Review application was approved by the Zoning Administrator on October 30, 2023, <br />and the Vesting Tentative Map was approved by the Planning Commission on November 8, 2023. <br />No appeal of either action was filed, and the approvals are currently effective. <br /> <br />Project Description <br />The project proposes seven, three-story buildings with a total of 42 townhome-style <br />condominiums, totaling 69,302-square-feet of residential space. The townhomes would range in <br />size from approximately 1,403 to 2,150 square feet, with either 3 or 4 bedrooms. The proposed <br />project would also include approximately 20,000 square feet of group open space. Each <br />townhome would have a two-car private garage accessed via common access streets and three <br />guest parking spaces are provided within the project’s interior streets. The project is accessed <br />off Lockhart Lane via Evergreen Court and Scarlet Court. The internal streets loop around the <br />site, with Willow Oak Court dead-ending to provide access to three units at the end of Building <br />F. A site plan is shown in Figure 2 and an elevation of the proposed project is shown in Figure 3. <br />In issuing the Design Review approval, the Zoning Administrator found the project to be in <br />conformance with all of the applicable standards as defined in the ODS and elsewhere in City <br />regulations. <br /> <br />Figure 2: Site Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.