Laserfiche WebLink
<br />Resolution No. PC-97-33 <br />Page 14 <br /> <br />66. The applicant shall include erosion control/storm water quality measures on the final <br />grading plan which shall specifically address measures to prevent soil, dirt, and debris from <br />entering the storm drain system. Such measures may include, but are not limited to, <br />hydro seeding, hay bales, sandbags, and siltation fences and are subject to the review and <br />approval of the City Engineer/Director of Building Inspection. Ifno grading plan is <br />required, necessary erosion control/storm water quality measures shall be shown on the site <br />plan submitted for an on-site permit, subject to the review and approval of the Director of <br />Building Inspection. The applicant is responsible for ensuring that the contractor is aWare <br />of and implements such measures. <br /> <br />{end} <br />