Laserfiche WebLink
<br />• Damages - All damages to sprinklers and/or surrounding work areas shall be reported by Contractor <br />to the City and will be repaired by the Contractor at no additional cost <br /> <br />• Safety - All OSHA Safety Requirements must be adhered to by the Contractor and/or any <br />subcontractors while on-site <br /> <br />SPECIFIC SCOPE OF WORK: <br />1. Removal of the metal structure surrounding the generator, placing it on a trailer/flatbed for <br />disposal. <br />2. Removal of the Caterpillar cylinder engine with a 480 VAC 1,000 kW generator and diesel fuel <br />tank, placing them on a trailer/flatbed for disposal. <br />3. Preparation of the existing concrete pad and electrical stub-ups to the specifications of the new <br />generator (GC C9 250kW Outdoor standby generator). <br />4. Termination of all field wiring and internal wiring for equipment requiring disassembly for <br />proper disposal. <br />5. Sealing/Securing of the old diesel fuel line. <br />6. Facilitation of tightness (989) test of the fuel line, cleaning with proper wash water disposal, and <br />filling with grout. *Assistance from Environmental Division Manager upon request. <br />7. Inclusion of disposal costs for the generator and fuel tank in your estimate. <br /> <br /> <br />DocuSign Envelope ID: F525A306-8BF9-48E3-A552-7B4232EE8861DocuSign Envelope ID: AB91FD21-DAE2-4426-9C77-64582A7CE84DDocuSign Envelope ID: F2F8D7DE-DC83-42B9-896F-1B1561925E23