My WebLink
|
Help
|
About
|
Sign Out
WILSON GENERALCONTRACTING, INC. 2024403
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
W
>
WILSON GENERALCONTRACTING, INC. 2024403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2024 3:19:35 PM
Creation date
11/27/2023 9:36:05 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Maintenance Services
Contract Type
New
NAME
WILSON GENERALCONTRACTING, INC.
Contract Record Series
704-05
Munis Contract #
2024403
Contract Expiration
12/31/2023
NOTES
INSULATION IMPROVEMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wilson General Contracting Inc. <br />1852 W 11 St., Suite 149 <br />Tracy, CA 95376 <br />(925) 915 1606 <br />w_generalcontractor@yahoo.com <br />http://www.wilsongeneralcontracting.com <br />Contract <br />ADDRESS <br />City of Pleasanton <br />Mechanic Shop <br />3333 Busch Road <br />P.O. Box 520 <br />Pleasanton, CA 94566 <br />DATE <br />10/31/2023 <br />TOTAL <br />$184,781.00 <br />ACTIVITY QTY RATE AMOUNT <br />Installation <br />Install Rmax thermasheath 3.0" R value 20.3 <br />Install Rmax insulation all through out the <br />mechanic shop secure all rigid insulation with <br />L channel brackets, tape all sims with 3m foil <br />tape metal roof ceiling. 6,500 sq ft. labor to <br />install. <br />1 119,260.00 119,260.00 <br />Materials <br />Rmax thermasheath 3.0 glue and sim tape <br />fastening screws bracket straps to hold down <br />insulation L channel bracket to support rigid <br />insulation. <br />1 58,021.00 58,021.00 <br />Tool Rental <br />Scissor lift Qty 2 for 4 weeks. <br />1 3,500.00 3,500.00 <br />Pad and Protection <br />cover work area, tools and vehicles with <br />plastic section off the area if needed. <br />Remove and dispose plastic garbage <br />everyday. Set up and break down all work <br />area. <br />1 4,000.00 4,000.00 <br />TOTAL $184,781.00 <br />No permit or fees included in this proposal. Contractor cannot <br />guarantee all area will be insulated due to accessibility of certain <br />areas and junction box, brackets and sprinkler system, pipes, <br />rafters, hoses, and metal framing. Any changes on scope of <br />work will be change order.THANK YOU. <br />EXHIBIT A <br />DocuSign Envelope ID: C872947D-41CE-4639-8F1A-296D6CD20936
The URL can be used to link to this page
Your browser does not support the video tag.