My WebLink
|
Help
|
About
|
Sign Out
WILSON GENERALCONTRACTING, INC. 2024403
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
W
>
WILSON GENERALCONTRACTING, INC. 2024403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2024 3:19:35 PM
Creation date
11/27/2023 9:36:05 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Maintenance Services
Contract Type
New
NAME
WILSON GENERALCONTRACTING, INC.
Contract Record Series
704-05
Munis Contract #
2024403
Contract Expiration
12/31/2023
NOTES
INSULATION IMPROVEMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />EXHIBIT A – SCOPE OF SERVICES <br /> <br />• City Project Manager - Project Manager will be the Facilities Supervisor or his Designee <br /> <br />• Contractor Entry into OSC – Contractor will need to provide a list of all employee’s names. Once <br />approved, Contractor will be issued a temporary Proximity Card for on-site entry to project location. <br />Contractor will be responsible to gaining access to the OSC yard for his employees and <br />subcontractors. At the end of the Projector Contractor must return the Proximity Card back to the <br />Project Manager. <br /> <br />• Hours of Services – will be 7am to 3:30pm; any variation in start/end times must be approved prior <br />to with the Project Manager and agreed upon by both parties <br /> <br />• Uniforms - Contractor’s crews should be identified either by a Company uniform, or by a safety <br />vest worn outside other clothing with the Company name clearly displayed <br /> <br />• Materials - Contractor shall furnish, as part of this agreement, all necessary personnel, supplies and <br />materials needed for the completion of the identified project. Contractor will be responsible for <br />removing and disposing of any construction waste. Debris and trash shall be removed at the end of <br />each day’s work. All defective materials shall be removed in accordance with all applicable rules, <br />regulations, codes, law, ordinances, statues, etc. <br /> <br />• Equipment and Tools – Contractor is responsible for supplying all necessary equipment and tools <br />to perform the project as outlined, whether owned or rented with a third-party agency <br /> <br />• Supervision - Contractor must provide for adequate supervision and inspection of all work <br />performed to ensure that each requirement of these specifications is consistently met <br /> <br />• Communication - A supervisor/foreman representing the contractor shall be readily available to <br />meet with the Project Manager or Designee as needed for the purposes of correcting problems, <br />conflicts, and coordinating work schedules <br /> <br />• Inspection - Inspection by Project Manager or Designee shall be made during normal City operating <br />hours, unless otherwise arranged <br /> <br />• Satisfaction - The progress and standard of quality of work to be accomplished shall be to the <br />degree reasonably acceptable to the Project Manager. In the event the Project Manager or his <br />designee determines contractor's work is unsatisfactory, contractor will be required to perform the <br />additional work at no cost to the City <br /> <br />DocuSign Envelope ID: C872947D-41CE-4639-8F1A-296D6CD20936
The URL can be used to link to this page
Your browser does not support the video tag.