Laserfiche WebLink
f <br />Addendum No. 1 <br />August 31, 2023 <br />PLEASANTON,, <br />ADDENDUM NO. 1 <br />INSULATION IMPROVEMENTS @ OSC MECHANIC'S SHOP <br />Project No. PWD 23-401 <br />This Addendum is hereby made a part of the project contract documents. It shall be the responsibility <br />of the general contractor to inform any affected sub-bidder of the content of this Addendum. <br />The Contract documents are modified/clarified as follows: <br />General: <br />1) It was brought to our attention by one of the potential contractors that the estimated square <br />footage of the specified project area was incorrect at 3,000 square feet. Staff and contractor <br />went out and re-measured the identified area and concluded that the estimated square footage is <br />6,500. The estimated square footage was called out in several locations of the RFB PWD 23- <br />401. <br />a) Item#1: The Bid Proposal for square footage calculation for this project moving <br />forward shall be 6,500 square feet. If potential contractor desires to re-measure the <br />location, feel free to contact the Management Analyst to survey the area. . <br />All other items of work in the contract document remain unchanged. Acknowledgement and a signed <br />copy of this Addendum shall be included in the Bid Proposal. <br />Daniel Villasenor, Management Analyst Steve Castaneda, Project Manager <br />Operations Facilities - Supervisor <br />ACKNOWLEDGED: <br />Company l/C 60^/ CeQXA& CoN TAACMtbate:0 9/ 0 4//a 00-3 <br />Signature:/` G Title: c es i d <br />DocuSign Envelope ID: C872947D-41CE-4639-8F1A-296D6CD20936