Laserfiche WebLink
<br />Resolution No. PC-97-21 <br />Page 15 <br /> <br />78. The developer shall sweep or vacuum the parking lot and sidewalks a minimum of once a <br />month and shall prevent the accumulation of litter and debris on the site. Comers and <br />hard to reach areas shall be swept manually. If sidewalks and/or the parking lot are <br />pressure washed, debris must be trapped and collected to prevent entry into the storm <br />drain system. No cleaning agent may be discharged into the storm drain. If any cleaning <br />agent or degreaser is used, wash water must be collected and discharged to the sanitary <br />sewer, subject to approval of the Dublin-San Ramon Services District (DSRSD). <br /> <br />79. The developer shall label all on-site storm drain inlets with the wording, "No Dumping-- <br />Drains to Bay" using City-approved methods and materials. On-site storm drain facilities <br />shall be cleaned a minimum of twice a year as follows: immediately prior to October 15 <br />and once in January. Additional cleaning may be required iffound necessary by the City <br />Engineer/Director of Building Inspection. <br /> <br />80. The developer shall include erosion control/storm water quality measures on the final <br />grading plan which shall specifically address measures to prevent soil, dirt, and debris <br />from entering the storm drain system. Such measures may include, but are not limited to, <br />hydroseeding, hay bales, sandbags, and siltation fences and are subject to the review and <br />approval of the City Engineer/Director of Building Inspection. The developer is <br />responsible for ensuring that the contractor is aware of and implements such measures. <br /> <br />81. The developer shall submit a construction Best Management Practices (BMP's) program <br />for review and approval by the Planning Director prior to issuance of building and/or <br />grading permits. These BMP's shall be implemented by the general contractor and all <br />subcontractors and suppliers of materials and equipment. Construction site cleanup and <br />control of construction debris shall also be addressed. Failure to comply with the <br />approved construction BMP may result in the issuance of correction notices, citations, or <br />a stop work order. <br /> <br />82. The developer is responsible for implementing the following measures during all <br />construction phases of the project: <br /> <br />a. Gather all construction debris on a regular basis and place it in a dumpster or <br />other container which is emptied or removed an a weekly basis. When <br />appropriate, use tarps on the ground to collect fallen debris or splatters that could <br />contribute to storm water runoff pollution. <br /> <br />b. Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement <br />and storm drains adjoining the site. Limit construction access routes onto the site <br />and place gravel on them. Do not drive vehicles and equipment off paved or <br />graveled areas during wet weather. Broom sweep the street pavement adjoining <br />the project site on a daily basis. Scrape caked-on mud and dirt from these areas <br />before sweeping. <br />