Laserfiche WebLink
<br />Resolution No. PC-97-21 <br />Page 13 <br /> <br />64. The developer shall submit a final grading and drainage plan prepared by a licensed civil <br />engineer depicting all final grades and on-site drainage control measures, including <br />concrete-lined V -ditches, to protect all cut and fill slopes from surface water overflow. <br />This grading/drainage plan shall be submitted to the City Engineer and/or the Director of <br />Building Inspection for review and approval before issuance of any building permits. <br /> <br />65. The developer shall submit a refundable cash bond for hazard and erosion control prior to <br />issuance of an Engineering or Building Department permit. The amount of this bond will <br />be determined by the City Engineer. <br /> <br />66. Any existing well on the site shall be removed or sealed, filled and abandoned pursuant to <br />Alameda County Ord. 73-68, prior to the start of grading operations unless Zone 7 retains <br />specific wells for observation wells, or special approval is obtained from the City <br />Engineer for temporary use of an existing well for construction water. Any wells <br />designated for abandonment or any wells, encountered during construction, shall be <br />destroyed in accordance with a permit obtained from Zone 7. <br /> <br />67. Any existing septic tank or holding tank on the site shall be removed or sealed, filled, and <br />abandoned, pursuant to the requirements of the Alameda County Department of Health <br />Services. <br /> <br />68. The haul route for all materials to and from this development shall be approved by the <br />City Engineer prior to the issuance of an encroachment permit. <br /> <br />69. The applicant shall include erosion control measures on the final grading plan, subject to <br />the approval of the City Engineer. The applicant is responsible for ensuring that the <br />contractor is aware of such measures. All cut and fill slopes shall be revegetated and <br />stabilized as soon as possible after completion of grading, in no case later than <br />October 15. No grading shall occur between October 15 and April 15 unless approved <br />erosion control measures are in place, subject to the approval of the Building Department. <br />Such measures shall be maintained until such time as permanent landscaping is in place. <br /> <br />70. Approval ofthe storm drainage system shall be subject to the review and approval of the <br />City Engineer and Zone 7, to determine that the system is adequate, connects to an <br />approved point of discharge, meets any and all applicable requirements of the Alameda <br />County Flood Control District - Zone 7, meets any and all applicable requirements of the <br />Federal Emergency Management Flood Hazard Program, and meets the immediate and <br />long-range requirements of this development. <br /> <br />71. The developer shall submit a dust control plan or procedure as part of the improvement <br />plans. <br />