My WebLink
|
Help
|
About
|
Sign Out
16
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
110723 REGULAR
>
16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2023 4:48:37 PM
Creation date
11/2/2023 4:41:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/7/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 14 shows the three-year CIP expenditures from FY 2024 through FY 2026.Most planned CIP expenses for <br />the three-year period are anticipated to be cash funded through rate revenues and existing capital reserves. The City <br />plans to take out a$6M loan in FY 2024, the proceeds of which will be spread out over the three-year period to <br />fund the remainder of the CIP expenditures. <br />Figure 1-4: Planned CIP Expenditures <br />Capital Projects <br />12.0 <br />Cn <br />C <br />10.0 <br />8.0 <br />6.0 <br />4.0 <br />2.0 <br />0.0 <br />FY 2024 FY 2025 FY 2026 <br />Rate Funded Debt Funded <br />1.8. Proposed Water Rates <br />Table 1-5 and Table 1-6 show the proposed bi-monthly meter service charge consumption charges,respectively, <br />for FY 2024 through FY 2026 based on the above recommendations. Rates for FY 2024 are determined based on <br />the results of the COS analysis. The overall revenue collected in FY 2024 will match the rate adjustment for that <br />year but impacts to individual customer classes may differ. Rates for all subsequent years are determined based on <br />the corresponding revenue adjustments in Table 14. Please note that rates for January 2024 and beyond include <br />assumptions for Zone 7 water purchase costs;however, the Zone 7 passthrough rates will be calculated based on <br />actual costs paid to Zone 7 in any given year.The proposed rates shown for these years may differ based on <br />changes to Zone Ts wholesale water rates. <br />Table 1-5: Proposed Meter Service Charges <br />Bi-Monthly Meter Service <br />Current January January January <br />Charge 2024 20251 <br />5/8 inch 19.93 21.90 24.96 26.50 <br />3/4 inch 29.89 31.43 35.43 37.16 <br />1 inch 49.84 55.27 61.64 63.87 <br />1-1/2 inch 99.67 $117.23 $129.75 $133.25 <br />2 inch 159.48 $155.37 $171.68 $175.97 <br />3 inch 348.90 $431.84 $475.59 $485.60 <br />4 inch 996.83 $755.97 $831.89 $848.61 <br />6 inch 1,993.67 $1,337.52 $1,471.17 $1,499.93 <br />8 inch 3,488.91 $3,339.54 $3,671.91 $3,742.08 <br />8 CITY OF PLEASANTON
The URL can be used to link to this page
Your browser does not support the video tag.