My WebLink
|
Help
|
About
|
Sign Out
5
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2023
>
11-08_SPECIAL
>
5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 4:03:09 PM
Creation date
11/1/2023 3:05:41 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/8/2023
DESTRUCT DATE
15Y
Document Relationships
5_Exhibit A
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\11-08_SPECIAL
5_Exhibit A Attachment 1
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\11-08_SPECIAL
5_Exhibit B
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\11-08_SPECIAL
5_Exhibit C
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\11-08_SPECIAL
5_Exhibit D
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\11-08_SPECIAL
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tract 8676, 2025 Santa Rita Road Planning Commission <br />Page 6 of 6 <br /> <br /> <br />impacts and cumulative impacts which were not discussed in the prior EIR prepared for the <br />zoning action, general plan, or community plan, or (3) are previously identified significant <br />effects which, as a result of substantial new information which was not known at the time the <br />EIR was certified, are determined to have a more severe adverse impact than discussed in the <br />prior EIR. Section 15183(c) further specifies that if an impact is not peculiar to the parcel or to <br />the proposed project, has been addressed as a significant effect in the prior EIR, or can be <br />substantially mitigated by the imposition of uniformly applied development policies or <br />standards, then an additional EIR need not be prepared for that project solely on the basis of <br />that impact. <br /> <br />As illustrated by the attached Consistency Checklist, the proposed project is found to be in <br />conformance with the analysis and conclusions of the Housing Element Update FEIR. This <br />determination is based on the following criteria: <br /> <br />1. There are no new significant effects peculiar to the proposed project or its site; <br />2. There are no new significant effects that were not previously evaluated in the <br />Housing Element Update FEIR; <br />3. There are no new significant off-site or cumulative impacts that were not analyzed <br />in the Element Update FEIR, and <br />4. There are no adverse impacts that are more severe than those previously <br />identified in the Element Update FEIR. <br /> <br />The following mitigation measures identified in the Housing Element Update FEIR are <br />applicable to the proposed project, as described in each environmental topic: <br />• MM AIR-1a <br />• MM AIR-1b <br />• MM BIO-1 <br />• MM GEO-6 <br />• MM HAZ-2 <br />• MM NOI-1 <br />• MM NOI-2 <br />• MM TRANS-2 <br /> <br />This evaluation concludes the proposed project qualifies for an exemption from additional <br />environmental review under Section 15183 because it is consistent with the development <br />density and land use characteristics established by the City, as analyzed by the Housing <br />Element Update FEIR. Further, the Housing Element Update FEIR adequately anticipated and <br />described the impacts of the proposed project, identified applicable mitigation measures <br />necessary to reduce project-specific impacts, and the proposed project would implement these <br />mitigation measures. <br /> <br />At the October 30, 2023, meeting the Zoning Administrator found the 2023-2031 (6th Cycle) <br />Housing Element Update Program EIR CEQA Guidelines Section 15183 Consistency <br />Checklist for the Harmony Condominium project is adequate to serve as the environmental <br />documentation for this project and satisfy all the requirements of CEQA. <br />
The URL can be used to link to this page
Your browser does not support the video tag.