Laserfiche WebLink
6-1 <br />DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. <br />Water Supply Alternatives Study-Draft Report.docx <br />Section 6 <br />References <br />Carollo Engineers, 2022. 50% Design Deliverable Opinion of Probable Construction Cost (OPCC), PFAS Treatment <br />and Wells Rehabilitation Project. Prepared for the City of Pleasanton. September 2022. <br />Carollo Engineers, 2021. Basis of Design Report, PFAS Treatment and Wells Rehabilitation Project. Prepared for the <br />City of Pleasanton. August 2021. <br />City of Pleasanton, 2019. Pleasanton Water Quality: Understanding PFOA and PFOS. Accessed October 3, 2023. <br />Available at https://www.cityofpleasantonca.gov/documents/osc/PFAS_Brochure.pdf <br />ESA, 2022. Initial Study/Mitigated Negative Declaration, City of Pleasanton PFAS Treatment and Wells Rehabilitation <br />Project. Prepared for the City of Pleasanton. June 2022. <br />West Yost, 2021. City of Pleasanton 2020 Urban Water Management Plan (UWMP). Prepared for the City of <br />Pleasanton. June 2021.