My WebLink
|
Help
|
About
|
Sign Out
17
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
101723 REGULAR
>
17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2023 10:22:31 AM
Creation date
10/13/2023 9:40:19 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/17/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 3: Alternatives Evaluation Water Supply Alternatives Study <br />3-3 <br />DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. <br />Water Supply Alternatives Study-Draft Report.docx <br />3.3.2 Costs <br />The accuracy level of capital costs varies based on the maturity level of a project’s design, as <br />depicted in Figure 3-2. Because the City had progressed the PFAS Treatment Project through 50 <br />percent design, capital costs for Alternative 1 (Baseline Project) and Alternative 2 (Reduced <br />Baseline) are estimated at a level consistent with Association for the Advancement of Cost <br />Engineering’s (AACE) definition of Class 2, which has an accuracy level of -15 percent to +20 <br />percent. In contrast, Alternative 3 (Two New City Wells) and Alternative 4 (100% Purchases from <br />Zone 7) are planning-level costs, consistent with AACE’s definition of Class 5 estimates for screening <br />conceptual projects, which has an accuracy level of -50 percent to +100 percent. <br />Figure 3-2. Capital cost estimating accuracy improves as the level of project definition improves <br />Figure 3-3 shows the estimated capital costs of each alternative with its respective accuracy range. <br />Information about the items included in capital costs for each alternative are provided in Appendix B.
The URL can be used to link to this page
Your browser does not support the video tag.