My WebLink
|
Help
|
About
|
Sign Out
17
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
101723 REGULAR
>
17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2023 10:22:31 AM
Creation date
10/13/2023 9:40:19 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/17/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents Water Supply Alternatives Study <br />iii <br />DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. <br />Water Supply Alternatives Study-Draft Report.docx <br />List of Figures <br />Figure 1-1. City Council engagement throughout the Pleasanton Water Supply Alternatives Study ..1-3 <br />Figure 1-2. Multi-step process for identifying and evaluating potential water supply alternatives.....1-5 <br />Figure 2-1. Alternative 1 (Baseline Project) overview.............................................................................2-4 <br />Figure 2-2. Centralized treatment facility isometric................................................................................2-5 <br />Figure 2-3. Alternative 3 (two new wells) overview.................................................................................2-6 <br />Figure 2-4. Pleasanton’s well pumping over time (April 2019-October 2022).....................................2-8 <br />Figure 3-1. Relative benefit scores of each alternative..........................................................................3-2 <br />Figure 3-2. Capital cost estimating accuracy improves as the level of project definition improves ...3-3 <br />Figure 3-3. Capital cost estimates and ranges for each alternative......................................................3-4 <br />Figure 3-4. Estimated annual O&M costs for each alternative..............................................................3-4 <br />Figure 3-5. Benefit score and estimated annual cost for each alternative...........................................3-5 <br />Figure 4-1. Draft timeline for implementing Alternative 3 (Two New Wells) .........................................4-5 <br />Figure 4-2. Draft timeline for contingency plan to pivot from implementing Alternative 3 (Two New <br />Wells) to Alternative 2 (Reduced Baseline).......................................................................................4-9 <br />List of Tables <br />Table 2-1. Potential Water Supply Options for Screening ......................................................................2-1 <br />Table 2-2. Results of Initial Screening of Potential Water Supply Options............................................2-2 <br />Table 3-1. Evaluation Criteria Definitions and Weightings.....................................................................3-1 <br />Table 3-2. Estimated Costs by Alternative...............................................................................................3-5 <br />Table 3-3. Tradeoffs Associated with Shortlisted Alternatives...............................................................3-6
The URL can be used to link to this page
Your browser does not support the video tag.