Attachment 2 <br /> TRANSPORTATION CORRIDOR PARKING LOT- Project No. 17448 <br /> CONTRACT CHANGE ORDER (CCO) SUMMARY- October 17, 2023 <br /> Change Order <br /> No. <br /> Description Requested By PCO# Price/Cost <br /> 1 1,1 Additional survey for storm drain City 3R1 $1,650.00 <br /> 1.2 Install storm drain sleeve City 14 $1,341.24 <br /> 1.3 Credit for storm drain trench City 1 -$7,300.00 <br /> 1.4 Remove unmarked pier and concrete slab GradeTech 7 $2,004.81 <br /> 1.5 Additional survey and staking for storm drain and wall GradeTech 12R2 $3,740.00 <br /> 1.6 Additional survey and staking for storm drain GradeTech 13R1 $2,777.50 <br /> 1.7 Additional 3"BSM soil City 15 $2,344.09 <br /> 1.8 Place 6"AB under Silva Cells GradeTech 16 $14,484.87 <br /> 1.9-1.11 Remove concrete blcok/kicker GradeTech 17,18,198 107.32 <br /> CCO 1 Subtotal: $29,149.83 <br /> 2 12.1 Additional concrete form and concrete for wall City 2R1 $1,114.45 <br /> 2.2 Additional rebar for retaining wall GradeTech 1081 $1,119.01 <br /> CCO 2 Subtotal: $2,233.46 <br /> 3 3.1 Electrical-light fixture increase GTI/Gremelli 8r1 $1,255.19 <br /> 3.2 PG&E service conduit extension City 34,36 $18,857.42 <br /> 3.3 Addional conduits&utility box at service cabinet GTI/Gremelli 21 $1,760.00 <br /> 3.4 Additional electrical conduit at Bernal City 25 $718.66 <br /> CCO 3 Subtotal: $22,591.27 <br /> 4 14.1 Landscape and irrigation modifcations per Delta 5(11-1-21) City 3721 900.41 <br /> CCO 4 Subtotal: $21,900.41 <br /> 5 15.1 Relocate construction temporary fence City 11812 158.62 <br /> CCO 5 Subtotal: $2,158.62 <br /> 6 6.1 Install storm drain sleeve under retaining wall City 4 $1,265.68 <br /> 6.2 Mason time for Abbie St grade review GradeTech 22 $294.32 <br /> 6.3 Concrete curb modifications City 24 $2,541.00 <br /> 6.4 Trench slurry backfill at Bernal Ave City 26 $3,032.21 <br /> 6.5 Credit for prime oil deletion GradeTech 30 -$983.69 <br /> 6.6 Demo concrete ramp at STA 6+10 City 32r1 $2,765.89 <br /> 6.7 Relocate water meter&backflow City 33r1 $1,329.18 <br /> 6.8 Centennial Towers Plaza base modifications City 38 -$6,576.69 <br /> 6.9 Main Street pedestrian pavers modifications City 38 -$1,000.00 <br /> 6.10 Extra work stacking and moving pavers at OSC City $2,483.80 <br /> CCO 6 Subtotal: $5,151.70 <br /> 7 7.1 Storm drain modifications at 164 Main St City 20.4 $5,000.00 <br /> 7.2 Additional rail for wood fence at 252 Main St City 27 $862.40 <br /> 7.3 Ditch modification at 234 Main St City 23 $2,294.97 <br /> 7.4 Relocate storm drain behind 234 Main St City 35472.60 <br /> 7.5 Stacking Existing Paver City 44 $1,392.69 <br /> 7.6 Cobble Installation&PGE box Adjustment City 46,47 L,5 49.82 <br /> CCO 7 Subtotal: $13,572.48 <br /> 8 18.1 Additional retaining wall architectural treatment City 28r2 $78,015.30 <br /> 8.2 Additional 280 tons Class II AB per bid item 9 1 GradeTech RFI 31 $27,160.00 <br /> CCO 8 Subtotal: $105,175.30 <br /> 9 19.1 Civic Park modifications City 38 $110,000.00 <br /> CCO 9 Subtotal: $110,000.00 <br /> 10 110.1 Pavers for Comcast City/Comcast 39 $3,713.60 <br /> CCO 10 Subtotal: $3,713.60 <br /> Contract Change Order: $315,646.67 <br /> 11 Balancing Change Order(Contract line Items changes) -$101,507.76 <br /> Total Contract Change Order issued: $214,138.91 <br />