My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
101723 REGULAR
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2023 4:41:17 PM
Creation date
10/11/2023 4:41:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/17/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> Addendum No. 1 <br /> August 31, 2023 <br /> PLEASANTON,, <br /> ADDENDUM NO. 1 <br /> INSULATION IMPROVEMENTS @ OSC MECHANIC'S SHOP <br /> Project No. PWD 23-401 <br /> This Addendum is hereby made a part of the project contract documents. It shall be the responsibility <br /> of the general contractor to inform any affected sub-bidder of the content of this Addendum. <br /> The Contract documents are modified/clarified as follows: <br /> General: <br /> 1) It was brought to our attention by one of the potential contractors that the estimated square <br /> footage of the specified project area was incorrect at 3,000 square feet. Staff and contractor <br /> went out and re-measured the identified area and concluded that the estimated square footage is <br /> 6,500. The estimated square footage was called out in several locations of the RFB PWD 23- <br /> 401. <br /> a) Item#1: The Bid Proposal for square footage calculation for this project moving <br /> forward shall be 6,500 square feet. If potential contractor desires to re-measure the <br /> location, feel free to contact the Management Analyst to survey the area. . <br /> All other items of work in the contract document remain unchanged. Acknowledgement and a signed <br /> copy of this Addendum shall be included in the Bid Proposal. <br /> Daniel Villasenor, Management Analyst Steve Castaneda, Project Manager <br /> Operations Facilities - Supervisor <br /> ACKNOWLEDGED: <br /> Company l✓/C 60^/ CeQXA& CoN TAACMtbate: 0 9/ 0 4//a 00-3 <br /> Signature:/�` --G Title: /°�c es i d �►� <br />
The URL can be used to link to this page
Your browser does not support the video tag.