My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
101723 REGULAR
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2023 4:36:54 PM
Creation date
10/11/2023 4:36:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/17/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alameda CTC agreement No.A23-0049 <br /> Project No. 157800 <br /> APPENDIX A-1 <br /> PROJECT DESCRIPTION <br /> Project Description: <br /> In the City of Pleasanton,on West Las Positas Boulevard between Hopyard Road and the Iron Horse Trail, <br /> the West Las Positas Multimodal Reconstruction(WLPMR) Project will reconstruct a 1.4 mile segment of a <br /> larger planned 3.8 mile reconstruction of West Las Positas Blvd to provide high-quality multimodal facilities <br /> that improve safety,connectivity,access,drainage,and roadway condition challenges along the corridor by <br /> replacing the degrading roadway and reconfiguring it from a 6-lane section to a 4-lane section with expanded <br /> pedestrian pathways(12'-14) and a 6'wide elevated cycle tracks on both sides of the roadway,landscaped <br /> buffers,intersection safety improvements,new parking accommodation,and a new stabilizing roadway <br /> subbase so that the new roadway surface can maintain a smooth and level profile for years to come. <br /> Project Limits <br /> • West Las Positas Boulevard between Hopyard Road and the Iron Horse trail,approximately 1.4 <br /> miles. <br /> Appendix a—Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.