My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
091923 SPECIAL
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 2:30:51 PM
Creation date
9/13/2023 2:25:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/19/2023
DESTRUCT DATE
15Y
Document Relationships
13 PUBLIC COMMENTS
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2023\091923 SPECIAL
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.10. Unit Cost Derivation <br /> After deriving the cost of service by cost component,we then determine the unit cost for each component.The unit <br /> cost is derived by dividing the revenue requirement for each cost component by the corresponding units of service. <br /> Table 3-16 shows the units of service for each customer class and tier for each cost component. The units of service <br /> are derived as follows: <br /> • Recycled Water: annual recycled water irrigation use <br /> • Recycled Water Surcharge: annual water use by class and tier <br /> • Base:annual water use by class and tier <br /> • Max Day:Max Day extra capacity <br /> • Max Hour:Max Hour extra capacity <br /> • Meter:EMUS by customer class <br /> • Customer:accounts by customer class <br /> • Zone 7 Fixed: EMUS by customer class <br /> • Zone 7 Variable: annual water use by class and tier excluding groundwater use <br /> Table 3-17 derives the unit cost by cost component.The costs of service(Table 3-15, Line 5)are multiplied by the <br /> units of service for each cost component(Table 3-16)to derive the final revenue requirement distribution.Note <br /> that the Meter,Customer,and Zone 7 Fixed unit costs are multiplied by bi-monthly billing periods per year to <br /> determine the annual cost to serve each class for those components.The final proposed revenue(Column M,Line <br /> 11)is equal to the total revenue requirement(Table 3-15,Column M,Line 5),and the final costs in each cost <br /> component(Line 10)are equal to their corresponding costs of service(Table 3-15, Columns B through L, Line 5). <br /> WATER AND RECYCLED WATER RATE STUDY REPORT 47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.