My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
091923 SPECIAL
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 2:30:51 PM
Creation date
9/13/2023 2:25:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/19/2023
DESTRUCT DATE
15Y
Document Relationships
13 PUBLIC COMMENTS
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2023\091923 SPECIAL
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 14 shows the three-year CIP expenditures from FY 2024 through FY 2026.Most planned CIP expenses for <br /> the three-year period are anticipated to be cash funded through rate revenues and existing capital reserves. The City <br /> plans to take out a$6M loan in FY 2024, the proceeds of which will be spread out over the three-year period to <br /> fund the remainder of the CIP expenditures. <br /> Figure 1-4: Planned CIP Expenditures <br /> Capital Projects <br /> $12.0 <br /> Cn <br /> C <br /> °_ $10.0 <br /> $8.0 <br /> $6.0 <br /> $4.0 <br /> $2.0 <br /> $0.0 <br /> FY 2024 FY 2025 FY 2026 <br /> ■Rate Funded ■Debt Funded <br /> 1.8. Proposed Water Rates <br /> Table 1-5 and Table 1-6 show the proposed bi-monthly meter service charge consumption charges,respectively, <br /> for FY 2024 through FY 2026 based on the above recommendations. Rates for FY 2024 are determined based on <br /> the results of the COS analysis. The overall revenue collected in FY 2024 will match the rate adjustment for that <br /> year but impacts to individual customer classes may differ. Rates for all subsequent years are determined based on <br /> the corresponding revenue adjustments in Table 14. Please note that rates for January 2024 and beyond include <br /> assumptions for Zone 7 water purchase costs;however, the Zone 7 passthrough rates will be calculated based on <br /> actual costs paid to Zone 7 in any given year.The proposed rates shown for these years may differ based on <br /> changes to Zone Ts wholesale water rates. <br /> Table 1-5: Proposed Meter Service Charges <br /> Bi-Monthly Meter Service Current January January January <br /> Charge 2024 20251 <br /> 5/8 inch $19.93 $21.90 $24.96 $26.50 <br /> 3/4 inch $29.89 $31.43 $35.43 $37.16 <br /> 1 inch $49.84 $55.27 $61.64 $63.87 <br /> 1-1/2 inch $99.67 $117.23 $129.75 $133.25 <br /> 2 inch $159.48 $155.37 $171.68 $175.97 <br /> 3 inch $348.90 $431.84 $475.59 $485.60 <br /> 4 inch $996.83 $755.97 $831.89 $848.61 <br /> 6 inch $1,993.67 $1,337.52 $1,471.17 $1,499.93 <br /> 8 inch $3,488.91 $3,339.54 $3,671.91 $3,742.08 <br /> 8 CITY OF PLEASANTON <br />
The URL can be used to link to this page
Your browser does not support the video tag.