My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
091923 SPECIAL
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 2:30:51 PM
Creation date
9/13/2023 2:25:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/19/2023
DESTRUCT DATE
15Y
Document Relationships
13 PUBLIC COMMENTS
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2023\091923 SPECIAL
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The draft Water System Master Plan will be completed by the end of <br /> 2023. <br /> 3. Water Program Funding: In addition to supporting the ongoing operational <br /> and service costs of continuing to deliver clean, reliable water to customers, <br /> funding will be required for the following: <br /> ■ Reserve replenishment to recover from the previous drought emergency <br /> and potential increased water supply expenses due to the loss of the <br /> City's groundwater wells and increases in DSRSD-EBMUD Recycled <br /> Water Authority (DERWA) recycled water wholesale rates. The water rate <br /> increases proposed in this report address the funding needed for <br /> this effort. <br /> ■ Rehabilitation/treatment of groundwater wells and/or implementation of <br /> alternative water supply sources. The Water Supply Alternative Project will <br /> identify the needed capital project; a Phase 2 water rate study to be <br /> completed by either late 2024 or early 2025 will propose the funding <br /> needed for the selected project. <br /> ■ Enhanced capital infrastructure projects for regulatory compliance, service <br /> enhancements, and address repair and replacement. Staff will initiate an <br /> update of the water financial plan (and on a four-year cycle moving <br /> forward) that evaluates annual costs to meet expected operational service <br /> levels and to implement a 10-year Capital Improvement Plan (CIP). This <br /> project will be completed in early 2024. <br /> Submitted by: Fiscal Review: Approved by: <br /> Norm Dorais Susan Hsieh Gerry Beaudin <br /> Interim Director of Director of Finance City Manager <br /> Public Works <br /> Attachments: <br /> 1. Water and Recycled Water Rate Study prepared by Raftelis <br /> 2. Public Hearing Notice to Ratepayers <br /> 3. Resolution for Water rates <br /> 4. Resolution for Sewer rates <br /> 5. Frequently Asked Questions <br /> Page 19 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.