Laserfiche WebLink
Pleasanton 2023-2031 Housing Element August 2023 Revisions <br /> 3. Other High Density Sites Larger than 10 Acres (Hacienda Terrace, Metro 580, <br /> Signature Center', and Oracle): Conduct outreach with the owners of these properties <br /> to discuss development constraints and opportunities, and to provide technical and <br /> planning support to facilitate development and opportunities. Such support may <br /> include offering incentives such as modification of parking ratios / relief from <br /> replacement parking requirements for commercial uses elsewhere on the site; <br /> assistance with developing site planning concepts; and advice/assistance on the steps <br /> to subdivide into appropriate sizes (e.g., 1 to 10 acres) and re-zone the properties for <br /> the desired residential uses. For those high density sites larger than 10 acres where <br /> the City has illustrated subareas within these larger sites that reflect areas expected <br /> to be redeveloped or infilled with housing (i.e., Metro 580, Oracle, Hacienda Terrace, <br /> and Signature Center 3), to improve the feasibility for redevelopment with housing, the <br /> City shall allow (without a requirement for legislative approval) flexibility in the precise <br /> location of the future housing within the larger site, provided that minimum densities <br /> and maximum unit counts remain within the ranges listed for each site in Appendix B <br /> (exempting additional density allowable by density bonus law). <br /> • Responsible Agency: Planning Division <br /> • Time Period: Complete concept-level planning (Framework) for the Stoneridge Mall <br /> (March 2023). Complete and adopt/approve detailed Master Plans for Stoneridge Mall site <br /> (July 2025) and Kiewit property (July 2024). Outreach to property owners for other large <br /> sites: June 2023, and coordination to offer technical support by October 2024. If the City's <br /> efforts are not resulting in progress toward housing entitlement/development on large sites <br /> by October 2026, the City will review and revise support efforts by May 2027. The City's <br /> action shall be commensurate with the level of progress toward housing <br /> entitlement/development on large sites (e.g., if no progress has been made, a rezoning <br /> action of additional sites may be required). <br /> • Funding Source: Planning Division Budget, developer funds <br /> • Quantified Objective: 200 lower-income units approved or constructed on large sites by <br /> January 2031 <br /> Program 1.8 <br /> Monitor the production of accessory dwelling units (ADUs) and junior accessory dwelling units <br /> (JADUs) to determine if they are being rented and, if so, determine their rent levels. Per the City's <br /> 3 Individual parcels within the Signature Center Area (Area 6) are less than 10 acres. While not required, <br /> the City is including the Signature Center Area(entire 14.66 acres in total) in this Program to further facilitate <br /> development of this Area. <br /> 2023-2031 Housing Element City of Pleasanton 128 <br />