Laserfiche WebLink
Woodard <br /> &Curran Rate Schedule <br /> Municipal Standard 2023 <br /> HOURLYSTAFF TYPE <br /> Project Assistant $130 <br /> Drafter $150 . <br /> Designer/Engineer 1 / Planner 1 /Technical Specialist 1 $200 <br /> Engineer 2/Planner 2/Technical Speciali3t 2 X225= <br /> Engineer 3/Planner 3 /Senior Designer/Technical Specialist 3 $250 <br /> Project Engineer 1 /Project Planner 1 /Project Technical.Specialist 1 $265., <br /> Project Engineer 2/Project Planner 2/Project Technical Specialist 2 $280 <br /> Project Manager 1 /Technical Manager 1 $300 <br /> Project Manager 2/Technical Manager 2 $315 <br /> SCADA Service Manager/Senior Project Manager/Senlor,Technical Manager: $335. <br /> Senior Technical Leader $345 <br /> National Practice Leader $350 <br /> EXPENSES <br /> Travel $0.655/mile <br /> Other Direct Costs At Cost Plus 10% <br /> Subconsultants/Subcontractors At Cost Plus 10% <br /> NOTES <br /> Mileage rate will change as the federal allowable rate is modified. <br /> This rate schedule is confidential and for customer internal use only. <br /> nAuo Woodard&Curran reserves the right to adjust billing rates annually. .aF + <br />