Laserfiche WebLink
ATTACHMENT 1 <br /> INTERIM WATER IMPROVEMENTS <br /> CIP No. 24171,24172,and 24173 <br /> 08/15/23 <br /> Project Funding to Date Amount Totals <br /> Annual Water Distributions System Improvements, CIP No. 23183 $1,000,000 <br /> Annual Water Distributions System Improvements, CIP No. 24183 $1,000,000 <br /> TOTAL PROJECT FUNDING TO DATE $2,000,000 <br /> Project Expenditures to Date <br /> Advertising $490 <br /> DPI, Inc. - Construction Contract 276,006 <br /> Total Project Expenditures to Date $276,495 <br /> Anticipated Project Expenditures <br /> DPI,Inc., CIP 23183 <br /> DPI, Inc. - Construction Contract $58,078 <br /> DPI, Inc. - Construction Contingency(approximately 15%) 50,000 <br /> DPI, Inc. - Change Order No. 2 For Urgent Water System Improvements 200,000 <br /> Testing/Inspection Services (On-Call Consultants) 35,000 <br /> DPI Inc. Subtotal $343,078 <br /> Rain for Rent(Purchase Order), CIP No. 23183 $200,000 <br /> Design for Interim Water Improvements <br /> Woodward & Curran, CIP No. 24171 $666,365 <br /> Pakpour Consulting Group, CIP No. 24172 121,216 <br /> Mark Thomas & Company, Inc., CIP No. 24173 231,906 <br /> Project Design Contingency(approximately 10%) 100,000 <br /> Design for Interim Water Improvements Subtotal $1,119,487 <br /> TOTAL PROJECT EXPENDITURES $1,939,060 <br /> Funding Balance/(Shortfall) <br /> Current Balance (to remain in CIP No. 24183) $60,940 <br /> Transfer from Annual Water Distrib. System Improv.,CIP No.23183 to Turnout 4&Booster <br /> Station&Stoneridge Drive 24-inch Potable Water Main(F-1 Line),CIP No.24171 $180,426 <br /> Transfers From Annual Water Distrib. System Improvements,CIP No.24183: <br /> Turnout 4 & Booster Station, Stoneridge Drive 24-inch Potable Water Main (F- <br /> I Line), CIP No. 24171 551,061 <br /> Bernal Avenue 18-inch Potable Water Main (F-4 Line), CIP No. 24172 133,000 <br /> Sunol Boulevard 10-inch Potable Water Main(F-7 Line), CIP No. 24173 255,000 <br /> $1,119,487 <br />