My WebLink
|
Help
|
About
|
Sign Out
PLE-2023-07-supp-30
City of Pleasanton
>
CITY CLERK
>
MUNICIPAL CODE SUPPLEMENTS
>
SUPPLEMENT NO. 30 - JULY 2023
>
PDF Supplement
>
PLE-2023-07-supp-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2023 12:56:03 PM
Creation date
8/4/2023 12:55:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
CODE SUPPLEMENTS
DOCUMENT DATE
7/1/2023
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17.50.050 <br />(Pleasanton Supp. No. 30, 7-23) 490 <br />project. Failure to comply with any of the terms of this chapter shall subject the covered project to the full range <br />of enforcement mechanisms set forth in Section 17.50.100 of this chapter. (Ord. 1934 § 1, 2006) <br /> <br />17.50.050 Submission of prepermitting documentation. <br />A. Prepermitting Documentation. In conjunction with the application for design review or planned unit development <br />design review, whichever is applicable, the applicant shall submit documentation indicating the measures to be <br />used to achieve the applicable green building rating (“prepermitting documentation”). The city encourages the <br />applicant to use a LEED™ accredited professional or similarly experienced person to prepare the prepermitting <br />documentation. This documentation shall include: <br />1. The applicable green building project checklist; <br />2. The applicable green building worksheet with an analysis of each credit claimed; and <br />3. Any other documentation that may be necessary to show compliance with this chapter. <br />B. Review and Prehearing Meeting. After submission of the prepermitting documentation required by subsection A <br />of this section, but prior to the hearing on the design review or planned unit development design review, the <br />green building compliance official shall review the prepermitting documentation and arrange a meeting with the <br />applicant to discuss the proposed green building measures, as needed. (Ord. 1934 § 1, 2006) <br /> <br />17.50.060 Review of prepermitting documentation. <br />A. Approval. The green building compliance official shall only approve the prepermitting documentation if it is de- <br />termined that the prepermitting documentation indicates that the covered project can achieve the applicable green <br />building rating, as set forth in Section 17.50.040 of this chapter. If the green building compliance official deter- <br />mines that these conditions have been met, the prepermitting documentation shall be marked “approved,” and re- <br />turned to the applicant. The green building compliance official shall provide a copy of the approved prepermit- <br />ting documentation at the hearing on the design review or planned unit development design review and shall no- <br />tify the building and safety division that the prepermitting documentation has been approved. No building permit <br />shall be issued until the prepermitting documentation has been approved under this section or an exemption has <br />been granted under Section 17.50.080 of this chapter. <br />B. Nonapproval. If the green building compliance official determines that the prepermitting documentation is in- <br />complete or fails to indicate that the covered project will meet the required green building rating for the covered <br />project as set forth in Section 17.50.040 of this chapter, he or she shall either: <br />1. Return the prepermitting documentation to the applicant marked “denied”, including a statement of reasons, <br />and so notify the building and safety division; or <br />2. Return the prepermitting documentation to the applicant marked “further explanation required”, and detail <br />the additional information needed. <br />C. Resubmission. If the prepermitting documentation is returned to the applicant, the applicant may resubmit the <br />prepermitting documentation with such additional information as may be required or may apply for an exemption <br />under Section 17.50.080 of this chapter. <br />D. Timing of Review. The green building compliance official shall review the green building project checklist and <br />all other prepermitting documentation for compliance with this chapter prior to the hearing on design review or <br />planned unit development design review, and again during plan check. (Ord. 1934 § 1, 2006) <br />
The URL can be used to link to this page
Your browser does not support the video tag.