Laserfiche WebLink
Page 2 of 7 <br /> <br />PROJECT DESCRIPTION: (300-word limit) <br />Please indicate project phase (Planning, PE, ENV, ROW, CON, O&M) <br /> <br />The projects considered for this funding include buffered bike lanes on Stoneridge Drive <br />between Santa Rita Road and Trevor Parkway, buffered bike lanes and sidewalk/ramp <br />improvements at I-580 overcrossings and intersection improvements at various <br />intersections along Valley Avenue, as recommended through the Bicycle and Pedestrian <br />Master Plan update. <br /> <br />CONTACT INFORMATION <br /> <br />Contact Name & Title: <br /> Matt Nelson, Assoc. <br />Traffic Engineer <br />Contact Email: <br />mnelson@cityofpleasantonca.gov <br />Contact Phone: <br />925-931-5671 <br />Agency: <br />City of Pleasanton <br /> <br />Topic CS Policy Consideration YES NO Required Description <br />1. Bicycle, Pedestrian and Transit Planning <br /> <br />Does Project implement relevant <br />Plans, or other locally adopted <br />recommendations? <br />Plan examples include: <br />• City/County General + <br />Area Plans <br />• Bicycle, Pedestrian & <br />Transit Plan <br />• Community-Based <br />Transportation Plan <br />• ADA Transition Plan <br />• Station Access Plan <br />• Short-Range Transit Plan <br />• Vision Zero/Systematic <br />Safety Plan <br /> These projects are <br />provided in the <br />Pedestrian and Bicycle <br />Master Plan, adopted in <br />2018. The improvements <br />will provide improved <br />access to all-ages and <br />abilities. <br /> <br />2. Active Transportation Network Does the project area contain <br />segments of the regional Active <br />Transportation (AT) Network? <br />[See AT Network map on the <br />MTC Complete Streets webpage.] <br /> The projects will provide protected bicycle lanes and separated pedestrian/bicycle intersection crossings. The projects will decrease the intersection crossing distances for bicycle and pedestrians as well.