Laserfiche WebLink
SOIL AND AGGREGATE PROPERTIES <br /> #200 Wash(D1140/C117) ............................................. $90/ea. Moisture Determination,tube sample(D2216) ............. $20/ea. <br /> Wet Sieve Analysis to#200(D422/CAL202) ................. 125/ea. Moisture Determination and Unit Weight(D2937) ........ 40/ea. <br /> Dry Sieve Analysis, 1.5"+Aggregate(D6913) ................ 350/ea. Atterberg Limits:Plasticity Index(D4318) ...................... 210/ea. <br /> Hydrometer Analysis(D422) ............................................ 175/ea. Sand Equivalent(D2419/CAL217) ................................. 100/ea. <br /> Sieve Analysis with Hydrometer(D422) .......................... 200/ea. pH and Resistivity(CAL643) ............................................ 125/ea. <br /> Specific Gravity,Soil(T100) ............................................. 100/ea. Sulfate Content(CAL417) ................................................ 95/ea. <br /> Specific Gravity Coarse Aggregate(C127) ...................... 75/ea. Chloride Content(CAL422) .............................................. 55/ea. <br /> Specific Gravity Fine Aggregate(C128)........................... 100/ea. Organic Content(D2974) ................................................. 85/ea. <br /> SHEAR STRENGTH <br /> Unconfined Compression(D2166) .................................. $110/ea. CONCRETE/MASONRY/REINFORCING STEEL <br /> Direct Shear(3 points)(D3080) ...................................... 350/ea. Compressive Strength,Cast Cylinders(C39) .................. $30/ea. <br /> Unconsolidated-Undrained Triaxial Shear(D2850) ....... 135/pt. Compressive Strength,Cores(C42) ................................ 85/ea. <br /> Unconsolidated-Undrained Triaxial Staged(D2850)...... 185/ea. Flexural Strength Beam(C78/C293) .............................. 80/ea. <br /> Consolidated-Undrained Triaxial Shear(D4767) ............ 315/pt. Splitting Tensile Test(C496) ............................................ 80/ea. <br /> Consolidated-Undrained Triaxial Staged(D4767) .......... 390/ea. DSA Masonry Shear(DSA-207)........................................ 75/ea. <br /> Consolidated-Drained Triaxial Shear(EM1110) ............. 400/pt. Shotcrete Panel Coring and Comp.Strength(C1140) ... 100/ea. <br /> Consolidated-Drained Triaxial Staged(EM1110) ........... 600/ea. Rebar Tensile/Bend(up to#11/#11 and larger)......275/300/ea. <br /> CMU Compressive Strength(C140) ................................ 100/ea. <br /> PERMEABILITY,CONSOLIDATION AND EXPANSION Compressive Strength,Grout(C1019/UBC 21-19) ....... 30/ea. <br /> Permeability, Flexible Wall(D5084) ................................ $315/ea. Compressive Strength, Mortar(C109/UBC 21-15,16) .. 30/ea. <br /> Permeability, Rigid Wall(D5856) .................................... 315/ea. CMU Unit Wt., Dimen.,Absorption(C140) ...................... 75/ea. <br /> Consolidation(D2435) ..................................................... 65/pt. Compressive Strength, Masonry Prism(C1314) ............ 250/ea. <br /> Expansion Index(D4829/UBC 29-2)............................... 225/ea. <br /> Swell/Collapse(D4546) ................................................... 175/pt. HOT MIX ASPHALT <br /> HMA Air Voids,Gyratory(T269)........................................ $525/ea. <br /> AGGREGATE QUALITY Hamburg Wheel Tracker(T324) ...................................... 1,000/ea. <br /> Sieve Analysis to#200(C136) ........................................ $125/ea. Theoretical Max.Specific Gravity(D2041/CAL309) ...... 180/ea. <br /> L.A. Rattler Test(500 rev.)(C131) .................................. 225/ea. Ignition/Sieve Analysis(C136/CAL202) ......................... 250/ea. <br /> Durability Index(D3744/CAL229)................................... 165/ea. HMA Core Unit Weight(D1188/CAL308) ........................ 100/ea. <br /> Fine Aggregate Angularity(CAL 234) ............................... 125/ea. %Asphalt, Ignition Method(D6307/CAL382) ................ 125/ea. <br /> Flat and Elongated Particles(D4791/CAL 235)............. 150/ea. %Asphalt, Ignition Calibration(D6307/CAL382) ............ 400/ea. <br /> Percent Crushed Particles(CAL205) ............................... 150/ea. Tensile Strength Ratio(T283)........................................ 1,000/ea. <br /> *2X surcharge on rush turnaround for laboratory testing <br /> TERMS AND CONDITIONS <br /> 1. Listed are typical charges for the services most frequently performed by Geocon.Prices for unlisted services as well as special quotations for programs <br /> involving volume work will be provided upon request.Laboratory test prices shown are for laboratory work only,and include reporting of routine results not <br /> calling for comments,recommendations or conclusions. <br /> 2. Sampling and testing is conducted in substantial conformance with the latest applicable or designated specifications of the American Society for Testing <br /> and Materials,Caltrans,American Association of State Highway and Transportation Officials,or other pertinent agencies. <br /> 3. Saturday,night work,and overtime hours are charged at time and one-half;Sundays and holidays at double time. Per diem may apply when location of work <br /> dictates. <br /> 4. Outside services including subcontractors will be billed at cost plus 15%.Hourly services are billed portal to portal from closest office in accordance with the <br /> stated hourly rates herein,with a minimum two-hour charge. <br /> 5. Invoices will be submitted at four-week intervals.Terms of payment are met upon presentation of invoice.Invoices become delinquent thirty(30)days from <br /> invoice date and subject to one and one-half percent(1-1/2%)service charge per month,or the maximum rate allowed by law,whichever is lower.If Client <br /> objects to all or any portion of any invoice,Client will so notify Geocon in writing within fourteen(14)calendar days of the invoice date,identify the cause of <br /> disagreement,and pay that portion of the invoice not in dispute.The parties will immediately make every effort to settle the disputed portion of the invoice. <br /> Payment on delinquent invoices will first be applied to accrued interest and then to the principal amount All time spent and expenses incurred(including <br /> any attorney's fees and costs)in connection with collection of any delinquent amount will be paid by Client to Geocon per Geocon's current fee schedule. <br /> 6. The above rates include all applicable fringe,overhead and profit calculations.No additional percentages for overhead,profit,or any other costs related to <br /> labor will be charged. Rates are current for Fiscal Year 2023-24(7/1/2023 - 6/30/2024).The City will consider annual adjustments based on CPI <br /> (Consumer Price Index,May of applicable years)and submitted prior to the end of the fiscal year for approval based on ENR Construction Index for San <br /> Francisco and Bay Area. <br /> 7. Reimbursable expenses are in addition to the agreed hourly fees and include actual expenditures made by the consultant in the interest of the project. <br /> Eligible reimbursable expenses shall be billed at cost with a 10%markup.Reimbursable expenses include such items as postage,reproduction,drawing <br /> plotting,printing,special materials,or equipment for project deliverable to the City.Consultant's printing and reprographics for internal uses are excluded. <br /> 6671 Brisa Street ■ Livermore,California 94550 ■ Tel (925)371-5900 <br /> Page 2 of 2 <br />