My WebLink
|
Help
|
About
|
Sign Out
_GHAD
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
051623
>
_GHAD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2023 12:11:55 PM
Creation date
6/6/2023 12:10:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/16/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
specially benefitted by construction proposed in a plan of control approved by the <br /> legislative body and (2) the assessments were previously approved by all property <br /> owners at the time the assessment was created. Since these criteria have been <br /> satisfied, the GHAD assessments can be increased by an amount not exceeding the <br /> ENR index without being subject to a Proposition 218 vote of current property owners. <br /> Staff did not schedule an informational meeting this year as there were no public <br /> inquiries in the past year. Staff recommends the GHAD Board schedule the public <br /> hearing for June 20, 2023, at 6:55 p.m. to receive comments on the proposed <br /> assessments. Additionally, public notices will be sent to all property owners within each <br /> GHAD notifying them that this agenda report is available on the City's website (in <br /> addition to the normal postcard noticing information). Any questions from owners will be <br /> presented to the GHAD Board of Directors, along with staff responses, on or before the <br /> June 20, 2023, agenda report. <br /> Contract Amendment with GHAD Consultant <br /> Despite performing maintenance within each GHAD prior to the arrival of winter storms, <br /> the Laurel Creek GHAD experienced a minor landslide that damaged an access road <br /> extending west of Crosby Drive to Dublin Canyon Road. The damage must be assessed <br /> by the City's consulting geotechnical engineer, ENGEO, Inc., in order to develop a <br /> repair scheme. The repair can then be implemented in fall 2023 together with other <br /> routine GHAD maintenance. <br /> The ENGEO Inc., cost proposal exceeds the amount available from the original contract <br /> plus contingency. The original contract presented to the City Council on December 15, <br /> 2020, limited total expenditures during the four-and-one-half-year term to $116,907. Of <br /> this amount, $112,909 has been encumbered, leaving $3,998 available. ENGEO's <br /> proposal for the damage assessment and repair scheme is $22,500. As such, the City <br /> must authorize a contract amendment in the amount of $18,502 for the work within the <br /> Laurel Creek GHAD to proceed. This will bring ENGEO's current contract amount to <br /> $135,409 for all CHAD-associated consulting work. This will reduce the total current <br /> fund reserve from $1 ,022,692 to $1 ,004,190. <br /> Submitted by: Fiscal Review: Approved by: <br /> Stephen Kirkpatrick Susan Hsieh Gerry Beaudin <br /> Director of Engineering Director of Finance City Manager <br /> Attachments: <br /> 1 . Resolution — Laurel Creek <br /> 2. Resolution — Moller Ranch <br /> 3. Resolution — Lemoine Ranch <br /> 4. Resolution — Oak Tree Farm <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.