My WebLink
|
Help
|
About
|
Sign Out
15
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
060623
>
15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2023 4:37:21 PM
Creation date
5/31/2023 4:23:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/6/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3333 Busch Rd 250kW <br /> Reference .. Name): Sourcewell <br /> piumEnseviv Quote#: 31172470 <br /> Sourcewell#:1:3 Revision: 2 <br /> 0• <br /> Date: May 26,2023 <br /> Notes(N),Deviations(D),Exceptions(E): <br /> (N) Fuel not included <br /> (N)ATS breakers have not been coordianted-upcharges could apply if required <br /> (N)Quoted 263213 Engine generator specs and "GENERATOR DATA SHEET" <br /> (D) Main breaker trip feature is LSI with ground fault relay indication <br /> 263213 <br /> (E) 1.01.0.6,8-Concrete pad,trenching, back filling,compaction, and paving by others <br /> (N)2.06.13.-Exhasut silencer is mounted inside enclosure and designed by manufacturer to meet system dBA requirement <br /> (E) 2.06.F.-Signage by others <br /> (D)2.06.H.-CAT factory enclosure to meet dBA requirement <br /> Dimensions: Estimated L x W x H of generator, enclosure and fuel tank assembly <br /> Length W Kkh Height <br /> 182" 57" 94° <br /> Weight: Estimated pounds of assembled generator, enclosure and fuel tank 8,000 tbs <br /> Equipment Availably: Estimated weeks after submittal approval 35-37 weeks <br /> Submittal Availability: Estimated 2-4 weeks <br /> Freight: FOB Jobsite. Off loading, crane, rigging, and installation by others <br /> Credit: Order subject to approval.Twenty five percent(25%)down with order, and seventy five percent(75%)due at delivery <br /> of equipment. Payment due net 30 days from date of invoice. <br /> Standard Exclusions(unless expressly provided for in writing in the quote): <br /> • All off engine piping,hangers,flanges,gasket,bolts,insulation,other materials and labor to install. <br /> • Items noted are"shipped loose"for contractor installation including any required interconnecting piping or to customer connections. <br /> • Permits:Any and all permit applications or costs including but not limited to local City,County,State and AQMD. Peterson Power will provide information <br /> as requested for use with permit application but assumes no responsibility or obligation to apply for or obtain subject permits.Peterson Power has <br /> provided equipment that to the best of our knowledge complies with all local,state and federal requirements. <br /> • Testing:Any and all associated testing,inspection,equipment,and certifications requested or required to be performed by a third party including circuit <br /> breaker coordination,system commissioning or building load testing.Not limited to NETA testing,infrared scanning,harmonic content or other 3 party <br /> agency testing of switchgear,switchboards,protective relays,circuit breakers,arc flash studies and reactive load testing. <br /> • Additional items that may be required by local utility for interconnection and parallel operation. <br /> www.petersonpower.com <br /> (800)963-6446 <br /> 3of10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.