My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
060623
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2023 4:20:37 PM
Creation date
5/31/2023 4:20:32 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/6/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID Cl F01626-C35A-41 E3-9669-4136828DC776 <br /> 4. ADDITIONAL INFORMATION (if applicable) <br /> NOTE: Only complete this section if you implement a platform other than SolarAPP+ <br /> Please identify whether the following features are supported by the implemented <br /> platform. All features are required for the platform to qualify for funding. CEC staff will <br /> verify prior to payment approval. <br /> Performs an automated plan review for residential solar energy <br /> systems that completes automatic code compliance checks based <br /> on user inputs (such as a contractor), thereby enabling or n Yes ® No <br /> otherwise issuing permits instantly when the project is confirmed <br /> as code compliant, without the need for human review <br /> Supports online, immediate fee payment once an application is ri Yes ® No <br /> complete, which may include auto-invoicing of permit fee costs <br /> Supports immediate generation of a permit job card followingri Yes ❑ No <br /> payment confirmation <br /> Blocks noncompliant applications from receiving a permit ®Yes 1i No <br /> EITHER: 1) Stand-alone permitting tool; OR 2) Integrates with ri Yes ri No <br /> current software and inspection platform already in use <br /> 5. REPORTING (REQUIRED) <br /> Following adoption and verification of a qualifying platform, the <br /> Energy Commission may request, and the Recipient will provide if <br /> requested, annual data on the number of permits issued for solar <br /> energy systems and a solar energy system paired with an energy Yes ri No <br /> storage system including relevant characteristics of those systems, <br /> such as system capacity. <br /> Please indicate your acceptance of these terms. <br /> March 2023 Page 3 of 4 APP-22-133 <br /> CaIAPP Attachment 01 City of Pleasanton <br />
The URL can be used to link to this page
Your browser does not support the video tag.