Laserfiche WebLink
City of Pleasanton Capital Improvement Program • FY 2023/24 - FY 2026/27 78 <br />The Sycamore Creek storm drain system was inun- <br />dated in the 2023 winter storms, depositing a large <br />amount of sediment and partially blocking the sys- <br />tem, causing localized flooding. The improvements <br />will reduce the potential for blocking, make the nec- <br />essary repairs to the system, and reduce the long- <br />term maintenance of the system. <br />Sycamore Creek Storm Drain Improvements <br />Project Number: 24662 (New) <br />Storm Drain <br />This project will make improvements to the Sycamore <br />Creek storm drain system to reduce maintenance <br />needs and improve reliability of the system. The project <br />will make improvements to the headwall structure, re- <br />align the 60-inch pipe at the intersection of Sycamore <br />Road and Sunol Boulevard, and repair and remove <br />sediment at the outlet of the system. <br />Department: Engineering <br />Project Phase: Design & Construction <br />Total Budget:$750,000 <br />Project Description: <br />Funding Source: Storm Drain R&R <br />Project Funding <br />Project Justification: <br />Fund Description Fund # <br />Current <br />Funding <br />Inc. Adjust- <br />ment <br />FY 2023/24 FY 2024/25 FY 2025/26 FY 2026/27 <br />Storm Drain R&R 441 -$200,000 $550,000 - -