Laserfiche WebLink
71 City of Pleasanton Capital Improvement Program • FY 2023/24 - FY 2026/27 <br />The existing electrical and control panel for S-14 <br />was in a below-grade vault and was damaged <br />by flooding during the January 2023 storms. The <br />station is currently operational with the use of tem- <br />porary power and controls. This project will install <br />a permanent outdoor electrical and control panel <br />that is above ground to reduce the risk of damage <br />from future storms. <br />Sewer Station S-14 Electrical Improvements <br />Project Number: 24265 (New) <br />Sewer <br />This project will design and construct a new outdoor <br />electrical and control panel for Sewer Lift Station S-14. <br />Department: Operations Services <br />Project Phase: Construction <br />Total Budget:$700,000 <br />Project Description: <br />Funding Source: Sewer Replacement CIP <br />Project Funding <br />Project Justification: <br />Fund Description Fund # <br />Current <br />Funding <br />Inc. Adjust- <br />ment <br />FY 2023/24 FY 2024/25 FY 2025/26 FY 2026/27 <br />Sewer Replacement CIP 431 -$700,000 - - -