Laserfiche WebLink
37 City of Pleasanton Capital Improvement Program • FY 2023/24 - FY 2026/27 <br />This annual project will restore proper street gutter <br />drainage run-off in order to protect the pavement <br />from failure due to saturated subgrade conditions. <br />This project will also reduce maintenance costs and <br />help keep city streets safe. <br />Annual Curb & Gutter for Street Resurfacing Projects <br />Project Number: 24509 <br />Transportation <br />As part of the annual resurfacing of city streets, various <br />sections of curb and gutter must be replaced along the <br />streets scheduled for resurfacing. The Americans with <br />Disabilities Act requires all intersection ramp areas to <br />be improved to current standards when the street is <br />resurfaced. Curb and gutter replacement locations are <br />determined through visual inspection by City staff. <br />Department: Engineering <br />Project Phase: Construction <br />Total Budget:N/A - Annual Project <br />Project Description: <br />Funding Source: GT/MB - ST/MBB - ST <br />Project Funding <br />Project Justification: <br />Fund Description Fund # <br />Current <br />Funding <br />Inc. Adjust- <br />ment <br />FY 2023/24 FY 2024/25 FY 2025/26 FY 2026/27 <br />Gas Tax 160 $600,000 $650,000 $550,000 $550,000 $550,000 <br />Measure B - Streets/ACTC 164 $142,013 ---- <br />Measure BB - Streets/ACTC 170 $7,987 ----