Laserfiche WebLink
Construction scheduled to begin Spring 2022 through <br /> Summer 2025. <br /> Project Cost : Total cost estimate to implement express <br /> lanes for both NB and SB directions is $480M. In the light <br /> of limited available&anticipated funding and to address <br /> near term traffic needs, a decision has been made to <br /> proceed with the design, right of way and construction <br /> work for the SB direction as the phase 1 of this project. <br /> The estimated cost for the SB direction is around $252M. <br /> Caltrans has a project in works to pave the existing <br /> pavement within approximately the same limits as the <br /> express lane. Caltrans has agreed to split their rehab <br /> project into NB and SB directions. They plan to move <br /> forward with the NB rehab as a stand-alone project which <br /> would go to construction in spring 2021. Their SB rehab <br /> will be combined with the SB express lane project and <br /> will begin construction in Spring 2022. <br /> schedule for the combined SB rehab and express lane <br /> project: <br /> • Design and ROW start—Jan 2020 <br /> • Design and ROW completion—October 2021 <br /> • CTC allocation of SHOPP and other state funds—Dec <br /> 2021 <br /> • Construction contract advertisement—January 2022 <br /> • Construction start—April 2022 <br /> • Construction completion—Summer 2025 <br /> • Applicant: <br /> • Staff Contact(s): Mike Tassano <br />