My WebLink
|
Help
|
About
|
Sign Out
01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
041823 SPECIAL
>
01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2023 3:47:37 PM
Creation date
4/12/2023 3:47:30 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/18/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2: Proposed New Projects <br /> Project Name Project Description Fund FY 2023/24 FY 2024/25 FY 2025/26 FY 2026/27 <br /> Repair and replacement of pavement of <br /> Annual Trail Improvements trails along the Arroyos at various 165 100,000 100,000 100,000 100,000 <br /> locations. <br /> Asset Management Plan for Repair and <br /> Replacement and Capital Improvement <br /> Asset Management Plan Projects(State of Good Repair projects 201 750,000 250,000 250,000 250,000 <br /> only). This plan is required to plan and <br /> fund maintenance needs of existing assets. <br /> FY 2024 allocation for installation of <br /> electrical upgrades for EV fleet charging <br /> CAP(EV Fleet Charging) stations at 200 Old Bernal and OSD. 201 1,000,000 - 500,000 500,000 <br /> Additional funding is recommended in FY <br /> 2025/26 and FY 2026/27 for further <br /> expansion. <br /> Irrigation Controller Replacement of irrigation equipment that <br /> Replacement Parks-Phase 1 are past useful life and update to current 221 150,000 150,000 150,000 150,000 <br /> standards. <br /> 5-14 Electrical Improvements Electrical improvements at the Sewer 431 700,000 - - - <br /> facility,5-14. <br /> Development of storm drain master plan to <br /> identify the maintenance needs,best <br /> Storm System Master Plan 441 - 500,000 - - <br /> practices and recommended budget for <br /> maintenance of the system. <br /> Condition assessment,design and <br /> Storm Lift Station Upgrades necessary replacement of components of 441 - 40,000 260,000 <br /> five storm drain pump stations. <br /> Design and construction to re-align a 60" <br /> Sycamore Creek Storm Drain storm drain line to help mitigate future <br /> Realignment flooding risk at Sycamore Creek and Sunol 441 200,000 550,000 <br /> Blvd. <br /> At the March 21, 2023, meeting, staff presented to the City Council a list of existing <br /> projects recommended to be either deferred or defunded in order to provide funding for <br /> new projects as well as additional funding for existing high priority projects. <br /> Approximately $8.2 million in the City's two miscellaneous capital funds, Miscellaneous <br /> CIP — General Fund and Street CIP — General Fund, are recommended to be <br /> repurposed for other projects. <br /> Existing Projects funded with Traffic Impact Fees <br /> The following three projects were approved and budgeted in FY 2019/20 and FY <br /> 2020/21 based on Traffic Impact Fee (TIF) revenue projections. However, due to lower <br /> than anticipated TIF revenues collected during the two-year budget period, there are not <br /> adequate funds for these projects. <br /> Project No. Description Amount <br /> 20569 Santa Rita Road @ Valley Avenue 4,590,474 <br /> 21556 Santa Rita.Fiber Interconnect 180,000 <br /> 20565 Nevada Street Improvements 2,549,816 <br /> Page 8 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.