Laserfiche WebLink
4 Project Name Tri-Valley Haven Emergency Shelter Rebuild <br /> Target Area Citywide <br /> Goals Supported Community Development Needs-Capital Improvements <br /> Needs Addressed Community Development Needs <br /> Funding CDBG:$250,000 <br /> Description Tri-Valley Haven will demolish its existing emergency shelter due to structural problems and other <br /> unhabitable conditions. Then it will rebuild the shelter that will provide 45 beds,which is 50%more <br /> capacity than the 30 beds provided by original shelter.CDBG funds will be used for foundation <br /> preparation,ground breaking,excavation,and trenching costs. <br /> Target Date 6/30/2024 <br /> Estimate the number and type Tri-Valley Haven will have 45 beds once the emergency shelter is constructed. <br /> of families that will benefit <br /> from the proposed activities <br /> Location Description Confidential location. <br /> Planned Activities Tri-Valley Haven plans to demolish an existing 30-bed emergency shelter and rebuild a new shelter that <br /> will have 45 beds. <br /> DRAFT Annual Action Plan 29 <br /> 2023 <br /> OMB Control No:2506-0117(exp.09/30/2021) <br />