Laserfiche WebLink
Ordinance No.2245 <br /> Page 8 of 37 <br /> 6. LIABILITY AND INDEMNIFICATION: To the extent permitted by law, the project <br /> applicant shall hold harmless, defend (with counsel acceptable to the City), and <br /> indemnify the City, its City Council, its officers, commissions, employee and agents from <br /> and against any claim, action, or proceeding brought by a third party against the <br /> indemnified parties and/or the applicant to attack, set aside, or void the approval of the <br /> project or any permit authorized hereby for the project, including without limitation, <br /> reimbursing the City its attorneys' fees and costs incurred in defense of the litigation. <br /> The City may, in its sole discretion, elect to defend any such action with attorneys of its <br /> choice. <br /> PLANNING DIVISION — 925-931-5600 <br /> Site Development and Building Design <br /> 7. PEDESTRIAN ENTRIES: Prior to issuance of a Building Permit, the applicant shall <br /> revise the design of all pedestrian entry point metal awnings to include a protective rain <br /> barrier which complements the metal awning design and overall building architecture to <br /> the satisfaction of the Planning Division. (Project Specific Condition) <br /> 8. BUILDING MATERIALS AND COLORS: The building materials and colors in the <br /> Approved Plans shall be stated on the building permit plans. <br /> 9. PAVING MATERIALS: The color, material, design, and product specifications for the <br /> paving materials used on-site shall be in conformance with the Approved Plans and <br /> included with the building permit submittal. Any proposed modifications to the final <br /> paving design details shall be subject to review and approval by the Planning Division <br /> prior to issuance of building permits. <br /> 10. WINDOWS: Manufacturer type, design, material, and installation details for all windows <br /> within the project shall be specified for each unit/building in conformance with the <br /> Approved Plans in the building permit submittal. Any proposed modifications shall be <br /> subject to review and approval by the Planning Division prior to issuance of building <br /> permits. <br /> 11. SIGN PROGRAM: Site and building signage shall be reviewed under a comprehensive <br /> sign program submitted to the Planning Division under a separate application. <br /> 12. FENCEIWALL: All fencing and walls shall be shown on the construction plans with the <br /> building permit submittal. The design and location must be approved by the Planning <br /> Division and comply with all setback requirements. <br /> 13. OUTDOOR STORAGE: There is to be no outdoor storage without prior approval by the <br /> City. <br /> 14. LIGHTING PLAN: The applicant shall submit a lighting plan with the building permit <br /> submittal. The plan shall include photometric contours, manufacturer's specifications on <br /> the fixtures, and mounting heights. All exterior lighting including landscape lighting shall <br /> be directed downward and designed or shielded so as to not shine onto neighboring <br /> properties or streets. The photometrics shall be reviewed and approved by the City <br /> Traffic Engineer and Director of Community Development prior to building permit <br /> issuance. The type and location of all exterior light fixtures shall be reviewed and <br /> approved by the Director of Community Development prior to building permit issuance. <br />