Laserfiche WebLink
Ordinance No.2245 <br /> Page 34 of 37 <br /> 112. CERTIFICATE OF COMPLETION: Upon completion of construction and prior to final <br /> inspection by the Building and Safety Division, the applicant's landscape architect shall <br /> submit a Certificate of Completion Package in PDF format to the Landscape Architecture <br /> Division for review and approval. The Certificate of Completion Package shall include: <br /> a. Project information sheet; <br /> b. Certificate of installation according to the landscape documentation package; <br /> C. Irrigation scheduling; <br /> d. Schedule of irrigation, landscape and irrigation maintenance; <br /> e. Landscape irrigation audit report; and <br /> f. Soil management report (if not previously submitted). <br /> 113. LANDSCAPING INSTALLATION: Prior to building permit final all landscaping shall be <br /> installed as shown on the approved building permit set and shall be inspected and <br /> approved by the Landscape Architecture Division. <br /> 114. CONCRETE CURBS: 6-inch vertical concrete curbs, with curb cuts or flush curbs with <br /> wheel stops, if determined to be acceptable by the Director of Engineering/City Engineer <br /> and Director of Community Development, shall be installed between all paved and <br /> landscape areas, in conformance with the City's Standard Specifications and Details. <br /> 115. EROSION CONTROL: For purposes of erosion control, the applicant shall plant a hydro <br /> seed mixture designed by the applicant's landscape architect and approved by the <br /> Landscape Architecture Division prior to installation. The erosion control shall be <br /> maintained by the applicant until permanent landscaping is in place. <br /> 116. BACKFLOW AND IRRIGATION METER SCREENING: All backflow prevention devices <br /> and above ground irrigation controls shall be located and screened to minimize their <br /> visual impacts. These devices with their proposed screening shall be shown on the <br /> landscaping and utility plans submitted with the building permit plans or improvement <br /> plans and shall be subject to the review and approval of the City Landscape Architect <br /> prior to their installation. If above-ground, they shall be painted forest green or an <br /> equivalent dark-green color. Screens shall consist of berms, walls, or landscaping <br /> satisfactorily integrated into the landscape plan. Landscape screens shall include <br /> shrubbery designed by species and planting density to establish a complete screen <br /> within 1 year from the date of planting. Weather protection devices, such as measures to <br /> protect pipes from freezing, shall require approval by the City Landscape Architect prior <br /> to use; at no time shall fabric or other material not designed and/or intended for this <br /> purpose be wrapped around or otherwise placed on these devices. (Project Specific <br /> Condition) <br /> 117. MAINTENANCE: The applicant and all future owners of the property shall, at no <br /> expense to the City, maintain all the landscaped areas related to the project in a <br /> healthful, attractive and reasonably weed-free manner consistent with the approved <br /> landscape plan, for the duration of the existence of the project. <br /> 118. SITE LIGHTING: All site lighting shall be designed for consistency with the International <br /> Dark-Sky Association's (IDA) Model Lighting Ordinance. This project site shall be <br /> considered to be in an LZ-2 zone for design purposes. Lighting shall be subject to review <br /> and approval by the City Landscape Architect prior to building permit issuance. (Project <br /> Specific Condition) <br />